Major projects
Ireland's biggest construction and infrastructure projects, from the first filing
Ireland's largest construction and infrastructure projects: every consent application accompanied by an Environmental Impact Assessment (EIAR) since 2017, across all consent regimes (An Coimisiún Pleanála, foreshore, roads, rail, waste). The major schemes, geocoded, with the applicant and the consent link.
The largest of these are consented directly by An Coimisiún Pleanála, the national planning body that replaced An Bord Pleanála.
2,033 projects tracked · updated weekly · page 39 of 41, projects 1,901 to 1,950
Updated weekly from the national EIA portal, so new schemes land here as the portal publishes them. Follow the strategic cases through the An Coimisiún Pleanála tracker and the infrastructure feed.
· checked against the sources below
Search and filter the full feed by regime, sector, keyword and linear schemes inside the app, and see every project on the map with the Pro major projects layer.
Sign in freeUtilities, civils or network-planning team? See your patch (grid, water, transport and energy schemes from first filing) in a 20-minute walkthrough, or read what PlanningLeads does for utilities, civil engineers and the public sector.
Book a demoErrigal Farms Limited
6.1: (a) The rearing of poultry in installations where the capacity exceeds 40,000 places.
Kildare County Council
11.5: Landfills, within the meaning of section 5 (amended by Regulation 11(1) of the Waste Management (Certification of Historic Unlicensed Waste Disposal and Recovery Activity) Regulations 2008 (S.I. No. 524 of 2008)) of the Act of 1996, receiving more than 10 tonnes of waste per day or with a total capacity exceeding 25,000 tonnes, other than landfills of inert waste.
KMK Metals Recycling Limited
11.4(b)(iv)- Recovery, or a mix of recovery and disposal, of non- hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, (other than activities to which the Urban Waste Water Treatment Regulations 2001 (S.I. No. 254 of 2001) apply): treatment in shredders of metal waste, including waste electrical and electronic equipment and end-of-life vehicles and their components;
Private applicant
The rearing of poultry in installations where the capacity exceeds 40,000 places
Private applicant
The rearing of poultry in installations where the capacity exceeds 40,000 places
PSE Kinsale Energy & PSE Seven Heads Limited
Decommissioning of certain facilities within the Kinsale Head and Seven Heads Petroleum Lease areas
Runways Information Services Limited (RISL)
the proposed development will consist of an expansion of the existing approved data centre Campus (Meath County Council ref: RA/150605 / An Bord Pleanala ref: PL 17.245347) comprising the following elements (a) Construction of two single-storey data centre buildings with a gross floor area (GFA) of cira 57,400m2; (b) A single storey administration / office building with a GFA of cira 5,710m2 which is physically linked to the proposed data centre buildings; (c) Site infrastructure to include entrance gates and appropriate signage, a security guardhouse of ciara 60m2 and associated canopy; (d) Road works including a new permanent site access, internal roadways, underpass & footpaths, circa 276 no. car parking spaces, bicycle parking facilities, upgrades to a section of the L5028 Kilbride Road together with an emergency access via the L10101 to include resurfacing only a section of the road and additional of cira 1 no. passing bay; (e) General drainage networks and arrangements and a connection to the existing public sewer network; (f) Surface level back-up generators with internal fuel tanks; (g) Hard & soft landscaping incorporating perimeter fencing to include both external and internal cira 3.0 metre high architecturally designed metal fencing and matching gates; (h) Temporary construction access and associated car parking arrangements off the Kilbride Road (L5028); and (i) Associated & ancillary site works. Planning permission is being sought for a 10 year period
Private applicant
Expansion and extension of life of quarry and associated works including demolition of habitable dwelling.
Forge Hill Recycling Ltd
An expansion to facilitate an increase in tonnage to 100,000 tonnes per annum of an existing Materials Recovery Facility. The proposed development will consist of 2 no. extensions to the existing waste handling building to allow for a proposed waste reception area, associated modifications to the facade, 1 no. diesel tank, external storage of ferrous and non ferrous metals, modifications to the site entrance including a new gate, fencing and all ancillary site development works.
Sean Kinsella Site Developments Limited
PERMISSION TO IMPORT INERT NATURAL MATERIALS, PRINCIPALLY EXCESS SOIL, STONE AND/OR BROKEN ROCK IN ORDER TO LEVEL OFF AGRICULTURAL LAND BY WAY OF RAISING EXISTING SITE LEVELS WITHIN AN APPLICATION AREA OF APPROXIMATELY 0.7 HECTARES (AND ALL WITHIN AN OVERALL SITE AREA OF 7.85 HECTARES). WORKS SHALL INCLUDE PROVISION OF SUITABLE DRAINAGE AND SITE WILL BE FINISHED BY PLACEMENT OF COVER SOILS AND SEEDING TO CONTINUE USE AS AGRICULTURAL LAND.
Roadstone Ltd.
Development consists of restoration of part (c. 6.7 ha) of existing quarry (QR19 06/11798 & PL04.225332) by importation of up to 300,000 tonnes per annum of inert soil and stones and river dredging spoil (EWC 17-05-04 and 17-05-06).The proposed soil recovery facility will utilise the permitted quarry infrastructure including internal roads, site office, welfare facilities and other ancillaries to complete the works. Access to the site will be from the permitted main entrance on the N22 National Primary Road. A wheel wash and weighbridge will be provided as part of the proposed development and the existing workshop will be utilised as a quarantine area. A hard-stand with drainage to oil interceptor will also be provided as a designated refuelling area. The total application area including the site infrastructure covers 7.9 ha of lands.
Advanced Environmental Services (Ireland) Ltd
An increase in the amount of waste accepted annually from 24,750 tonnes to 30,000 tonnes. The proposed increase does not require the construction/provision of any new buildings/structures or any alteration to the current site layout, drainage and operations
Shannon Foynes Port Company
Port capacity extension to consist of modifications to the existing jetties and quays, phased expansion of the port estate and all associated site development works
daa Plc
Permanent continuance of use of the existing 8,840 space long-term car park known as Holiday Blue and and the existing 2,040 space long-term car park known as Express Red Zones Y and Z (Express Red)
Dairygold Co-operative Society Ltd
Construction of: new CIP (Cleaning in Place) Bund with 6 no. tanks containing cleaning products (Bund 38), new part six-storey part single storey Production Building (Building 50) with new product bund and 12 no. silos and 2 no. single storey valve control buildings, new tanker unloading bay (Building 51), new part six-storey, part two-storey, Intermediate Product Store/Packaging Building (Building 52) and 2 no. loading bays, new single storey Finished Product Store 1 (Building 53) and 7 no. loading bays, new single storey Finished Product Store 2 (Building 54) and 6 no. loading bays, elevated visitor and operator access walkway from new laboratories and production building to the existing dryer and evaporator buildings, Relocation of existing Truck Washing Station, associated pipe racking, silos, compactor, signage and site works, new single storey Staff Entrance to existing Production Building 18, Alterations to and change of use of the existing Engineering Workshop and Stores Building to include new offices and laboratories and 2 no new loading bays (Building 04), Demolition of existing disused Garage (Building 27) and existing storage facility and loading bays (Buildings 05 and 2
Gaelectric Renewable Energy Developments Ltd
10 year planning permission for the development of a solar photovoltaic (PV) energy development.
College Proteins
to amend a permitted Biodiesel Manufacturing Facility (Meath County Council Reg. Ref. KA/160786), on a site of 1.49 hectares. The development will consist of the reconfiguration of the process building and associated tank farm and the provision of a new gas electricity generation unit with heat recovery. The reconfiguration on site will consist of: A revised configuration of the process building, resulting in an increase of c.53 sqm in the gross floor area of the building from c. 3,284 sqm to c. 3,337 sqm. There is no increase in the overall height of the building; An increase in the footprint of the tank farm and number of external storage tanks from 12 no. to 21 no.; Amendments to the permitted drainage layout; The proposed amendments do not result in an increase in the overall permitted production of 25,000 tonnes of biodiesel per annum. The following works will be completed as enabling works (as permitted under Reg. Ref. KA/160786): Site access works, excavation works and gravel infill to allow for the provision of foundations for the permitted layout of the process building.
Private applicant
the development consists of the construction of extension to an existing waste water treatment plant to include: - a) Coarse & fine screen, Balance tank, Sludge tank, Sludge press, Anoxic tank, Aeration tank, Clarifier, Sand Filter, Treated effluent pump sump, Coagulant storage tank, Odour Scrubber Unit, Control building and relocation of existing DAF unit. b) Associated site development works, including earth berm to perimeter of extended treatment plant and landscaping,.
Private applicant
The development consists of the construction of extension to an existing waste water treatment plant to include: - a) Coarse & fine screen, Balance tank, Sludge tank, Sludge press, Anoxic tank, Aeration tank, Clarifier, Sand Filter, Treated effluent pump sump, Coagulant storage tank, Odour Scrubber Unit, Control building And relocation of existing DAF unit. b) Associated site development works, including earth berm to perimeter of extended treatment plant and landscaping,
Greenacre Residential DAC
526 no. dwellings
Private applicant
Waste Management Facility
Planree Ltd
19 Turbine Wind Farm
Roadstone Ltd.
The extraction by quarrying of 300,000 tonne per annum of sandstone rock from an existing quarry (over a 20 year period) on a 26.8 hectare site
Private applicant
Construct a building (6625sq.m) containing a waste transfer and recycling facility. The proposed development also includes the construction of a separate two storey administration block (178 sq.m).
Crekav Trading GP Limited
Demolition of existing pre-fab classroom structure, construction of 536 no. units (104 no. houses and 432 no. apartments), widening and realignment of an existing vehicular access onto Sybil Hill Road to facilitate the proposed access road with footpaths and on-road cycle tracks from Sybil Hill Road and Sybil Hill House (Protected Structure) and St. Paul's College incorporating new accesses to Sybil Hill House and St. Paul's College and associated site works.
Roscommon County Council
N5 Ballaghaderreen to Scramoge Proposed Road Development, Co Roscommon
Private applicant
Permission for a period of 20 no. years on a site of c8.45 hectares permission is sought for the extension of the existing quarry onto adjoining lands to the west comprising an extraction area of c 5.83 hectares. The qaurry extension is sought to a maximum depth of c .38 metres OD and will be extracted at a rate of 100,000 tonnes per annum. The proposed development includes all ancillary site development, area's of stockpiling, landscaping and boundary treatment works above and below ground, including the progressive restoration of the final pit void (extractive area) to original level through the importation of inert soils. An environmental impact statement (non referred to an Environmental Impact Assessment Report (EIAR) will be submitted to the planning authority with the application.
Gannon Homes Ltd
Development of 92 houses and two storey free standing creche
Gannon Homes Ltd
Development of 96 Housing Units (42 houses and 54 Apartments)
Roadstone Ltd.
Extraction of aggregates using conventional drilling and blasting techniques, landscaping and restoration within an area of 19.65ha. The proposed activity area is within the existing Roadstone Ltd., landholding at Stoneyford Quarry. The development will consist of: Permission for stone extraction and processing using mobile crushing and screening plant. Permission for the deepening of the extraction area in part by 3 no. 17.5 benches to a final depth of of c. -27.5m AOD. The current permitted quarry floor is c. 18m AOD under An Bord Pleanala Ref: SU17.SU0070 and 25m AOD under P01/4442. Restoration of the site to a beneficial ecological afteruse.
Boliden Tara Mines DAC
the development works will consist of the resumption of underground mining in the Nevinstown orebody. The Nevinstown orebody being the closest section of the Navan orebody to surface. Previously planning permission was granted by An Bord Pleanala, ref PL17.204034, in January 2004; said permission has expired. Ore reserves will be mined sequentially over the lifetime of the operation. The resultant tailings waste will be accommodated in the existing tailings facility. Mining will follow a cyclic pattern resulting in the removal of ore from underground, hoisting to surface for processing followed by the filling of the extraction voids using cemented backfill. The surface characteristics and features of the Nevinstown townland will not be altered by mining activity. There will be no additional above ground structure/infrastructure associated with the development.
Taghart Energy Limited
the development will consist of: the installation of approximately 4km of underground electricty transmission cable across private lands and within the public roads numbered R165, L74021 and L7408. The cable will be installed predominantly in excavated trenches of approximately 1.2m in depth and will include associated underground ducting, joint bays, chamber bays, sheath link boxes and inspection chambers: ducting across the length of span of 1 no. bridge/culvert and directional drilling at 1 no. bridge/culvert; and all associated site development and reinstatement works.
Roadstone Ltd
for development which will consist of importation of inert excavated soil and stone natural material for the purpose of restoration of a previously extracted area ( 1.6309 hectares ), within the Woodcock Hill quarry site
ADVANCED ENVIRONMENTAL SOLUTIONS (IRELAND) LIMITED
DEVELOPMENT AT OUR EXISTING MATERIALS RECOVERY FACILITY AT BOGTOWN, CAPPANCUR, TULLAMORE, COUNTY OFFALY. THE DEVELOPMENT WILL CONSIST OF AN INCREASE IN THE AMOUNT OF WASTE ACCEPTED ANNUALLY FROM 60,000 TONNES TO 80,000 TONNES. THE PROPOSED INCREASE DOES NOT REQUIRE THE CONSTRUCTION/PROVISION OF ANY NEW BUILDINGS/STRUCTURES OR ANY ALTERATION TO THE CURRENT SITE LAYOUT AND OPERATIONS.
Hines Cherrywood Development Fund ICAV
The proposed development will comprise a total of 191,115sq.m (gross floor area - GFA) in 15 blocks including: 1,269 no. residential units (115,332 sqm), Retail Gross (20,284 sqm), High Intensity Employment (HIE) uses (22,946 sqm), Non Retail uses (31,115 sqm), Community uses (1,437 sqm) and associated works
Patrick McCaffrey and Sons Limited.
Quarry.
Roadstone Wood Ltd.
Quarry Development.
Patrick McCaffrey and Sons Limited.
Quarry.
DunoAir Windpark Curraheen Ltd
Windfarm comprising 8 turbines, 6 new access roads, electrical sub station, meteorological mast, 38 kv underground grid connection.
Cleanrath Windfarm Ltd.
11 No. Wind turbines.
Private applicant
Quarry.
Private applicant
Quarry.
Brookfield Renewables Ireland Ltd
Wind Farm comprising 11 no. turbines.
Private applicant
Retention of 1 no. pig house and demolition of 7 no. pig houses and ancillary structures and construction of 3 no. pig houses.
Private applicant
Biopark and all ancillary site development works including landscaping.
Gannon Properties
Construction of 263 no. residential units, shops, childcare facility and change of use of Belcamp Hall (protected structure RPS no 463) to residential use and all associated site works.
Holmpatrick Cove Limited
Construction of 24 no. houses, two-storey hotel and all associated site works. An EIS was submitted with the application.
Private applicant
Importation of subsoil and topsoil for land reclamation. Importation, recovery and recycling of concrete and brick materials for re-use and ancillary site works.
Boliden Tara Mines Limited
The lateral extension to the existing tailings storage facility and construction of an Integrated Constructed Wetlands.
Genvesat ULC.
Development of three 5-storey office blocks together with parking, services and storage space for each building. An EIS has been lodged with this application.