Major projects
Ireland's biggest construction and infrastructure projects, from the first filing
Ireland's largest construction and infrastructure projects: every consent application accompanied by an Environmental Impact Assessment (EIAR) since 2017, across all consent regimes (An Coimisiún Pleanála, foreshore, roads, rail, waste). The major schemes, geocoded, with the applicant and the consent link.
The largest of these are consented directly by An Coimisiún Pleanála, the national planning body that replaced An Bord Pleanála.
2,033 projects tracked · updated weekly · page 19 of 41, projects 901 to 950
Updated weekly from the national EIA portal, so new schemes land here as the portal publishes them. Follow the strategic cases through the An Coimisiún Pleanála tracker and the infrastructure feed.
· checked against the sources below
Search and filter the full feed by regime, sector, keyword and linear schemes inside the app, and see every project on the map with the Pro major projects layer.
Sign in freeUtilities, civils or network-planning team? See your patch (grid, water, transport and energy schemes from first filing) in a 20-minute walkthrough, or read what PlanningLeads does for utilities, civil engineers and the public sector.
Book a demoGlenveagh Homes Ltd
Planning permission for Phase 3 of a residential development consisting of the construction of 213 no. residential units and all ancillary development works including access, footpaths, cycle paths, parking, drainage, landscaping, lighting and amenity are
Private applicant
Lucan to City Centre Core Bus Corridor Scheme which has an overall length of approximately 9.7km including roadworks to facilitate bus, cycling and urban realm improvements along with any associated ancillary/accommodation works for the scheme.
Keohane Readymix Ltd
Extension (c. 10.8 hectares) of existing sand & gravel pit (Plan. ref. S/02/1023); completion of extraction & continuance of use; importation of c. 180,000 tonnes of soil for restoration; and restoration of overall site.
Irish Recycling Ltd
Phase 2 of a Recycling Plant. Phase 1 has been granted permission to recycle 35,000 tonnes of plastic bottles and aluminium drinks cans annually. Phase 2 will have the capacity to recycle an additional 35,000 tonnes of waste plastics annually.
Cairn Homes Montrose Limited
Large-scale Residential Development (LRD) of 688 no.apartments in 10 no.blocks; Hotel; Creche; Gym; Surface and basement car and cycle parking; Change of use of Mount Errol House (Protected Structure) and stable building to restaurant/cafe and artisan shop
Sky Castle Limited
Provision of c.200m of new portion of distributor road, provision of a new bridge structure and extension of water main assets, provision of site landscaping, public lighting, site services and all associated site development works.
Sky Castle Limited
Provision of c.200m of new portion of distributor road, provision of a new bridge structure and extension of water main assets, provision of site landscaping, public lighting, site services and all associated site development works.
Sky Castle Limited
Provision of a new bridge structure along the R157, new wastewater rising mains, new walkaways and cycle track, provision of site landscaping, public lighting, site services and all associated site development works.
Dublin City Council
578 no. apartments, community hub/library, creche, supermarket, 5 no. retail/café/restaurant/class 2 financial services units & 2 no. café/restaurant units), a public plaza fronting onto Emmet Road.
Private applicant
construction of a poultry house, feed silos, soiled and clean water storage tanks and all associated ancillary site works. Permission is also sought for the installation of PV/solar panels on the south-facing roof of the proposed poultry house.
Glenveagh Homes Ltd.
95 no. dwellings and roads, services and open space to serve Phases 3A-3D on a site of c. 6.7 hectares
Private applicant
Industrial building (for the purpose of medical device manufacturing), with a gross floor area (GFA) of 29,490 sq.m and all associated development.
Private applicant
The Construction of a railway approximately 18.8 kilometres in length which is mostly underground, 16 stations including 11 underground, 3,000 space park and ride, depot, associated works and other infrastructural modifications.
Oxigen Environmental Unlimited Company
Demolition of agricultural structures and development of a Materials Recovery Facility.
Sky Castle Limited
The development will consist of 3 office blocks and all associated site development works (GFA: 20,633.26m2) inlcuding surface car park, road upgrade, vehicular access, provision of services, new pedestrian and cycle bridge, solar PV panels, ESB kiosks
Private applicant
Permission to extend the existing limestone quarry at Carrigdownane Upper and Lisnagooreen, Rockmills, Co. Cork. An Environmental Impact Assessment Report (EIAR) will be submitted to the planning authority with the application.
Sky Castle Limited
Development of a 156 no. bedrooms two-storey Nursing Home (8,576m2 GFA), a three-storey Primary Care Centre (PCC) (3,049m2 GFA), car and cycle parking spaces, underground WWPS, road improvement works to the R157, and all ancillary and associated works.
Sky Castle Limited
The development of the Maynooth Outer Orbital Route (MOOR) and associated site works.
Sky Castle Limited
Provision of c.200m of new portion of distributor road, provision of a new bridge structure and extension of water main assets, provision of site landscaping, public lighting, site services and all associated site development works.
Sky Castle Limited
Provision of a new bridge structure along the R157, new wastewater rising mains, new walkaways and cycle track, provision of site landscaping, public lighting, site services and all associated site development works.
Shankill Property Investments Ltd.
The change of use of lands from former golf course use to residential and other uses consisting of 586 no. residential units and a childcare facility, café, retail unit and 1 no. commercial unit (incorporating a gym and juice bar).
Private applicant
Extraction of sand, stone and gravel over a 10 year period, screening/ processing of stone, construction of offices (33sq. m) welfare facilities, well surface water lagoon, weightbridge, wheel wash, entrance, parking and all ancillary site works.
LSREF V Eden TC6 Limited
Planning application for the provision of 162 no. residential units in development area 2 - Cherrywood within the Cherrywood SDZ Planning Scheme.
Glenveagh Living Limited
Phase 1 of the wider development of the Ballymastone Lands to accommodate 432 residential dwellings (inc. a mix of apartments, duplexes and houses), a crèche and public open space, car parking spaces, bicycle parking spaces, pedestrian/cycle links.
College Proteins
The development will consist of the demolition of an existing garage and the provision of an Anaerobic Digestion Facility with an intake of up to 50,000 tonnes of organic feedstock material per annum & all associated site works.
Private applicant
10 year permission sought for continued use of the existing quarry and associated processing permitted under P.Ref. 98/1235 and P.Ref. 04/5530 within an application area of c.14.2 hectares with restoration to a beneficial agricultural afteruse.
Kilshane Energy Ltd
Gas Turbine Power Generation Station with an output of up to 293 Megawatts
Gortyrahilly Wind Designated Activity Company
Construction of a 14 turbine wind farm along with the associated related works including a 110kV grid connection and upgrade works on the local roads
EdgeConnex Ireland Limited
110kV underground transmission line connections between the permitted Kishoge 110kV substation and the permitted Aungierstown - Castlebaggot underground 110kV transmission line, and all associated works.
Arnub Ltd. & Aspect Homes (ADC) Ltd.
702 no. residential dwellings, 2 no. childcare facilities, 4 no. retail units, 1 no. GP practice / medical use unit and all associated site works.
Breedon Cement Ireland Limited
the deepening of the north-western portion of the existing limestone quarry extraction area (as permitted by Meath County Council Planning Register Ref: TA900603) by four extractive benches to 10m OD, over an area of c. 4.13 hectares.
Private applicant
Ballymun / Finglas to City Centre Core Bus Corridor Scheme which has an overall length of approximately 11km including roadworks to facilitate bus, cycling and urban realm improvements along with any associated ancillary/accomodation works for the scheme.
Private applicant
Extension (c. 10.8 hectares) of existing sand & gravel pit (Plan. ref. S/02/1023); completion of extraction & continuance of use; importation of c. 180,000 tonnes of soil for restoration; and restoration of overall site.
Sky Castle Limited
Construction of 360 no. residential units comprising 196 houses, 102 duplexes and 62 apartments, provision of public park, creche, scout den, 4 no. bridge structures, 500m of distributor road, road improvements, access, car parking, and associated works.
Galway City Council
The Proposed Scheme provides infrastructure improvements and transport management measures for active travel (both walking and cycling), and the provision of enhanced bus priority measures.
Raheny 3 Limited Partnership
The construction of a residential development set out in 7 no. blocks, ranging in height from 4 to 7 storeys to accommodate 580 no. apartments, residential tenant amenity spaces, a crèche and a 100 bed nursing home
daa plc
The proposed development will consist of the construction of a subterranean Underpass of Runway 16/34, a critical airfield operational safety project.
Atlas GP Limited
Strategic Housing Development on 0.99 ha of land, consisting of 334 Build-to-Rent residential units within 4 apartment blocks, to include a creche of 272 sqm
Horizon Therapeutics Ireland DAC
Biopharmaceutical Development and Manufacturing Campus, as an extension to the existing Horizon Development and Manufacturing Facility
Glenveagh Homes Ltd.
The proposed development is for a Strategic Housing Development for the construction of 289. no residential units, a creche, and all ancillary site development works. An EIAR and NIS have been prepared in respect of the proposed development.
Boolyvannanan Renewable Energy Ltd
Five wind turbines (overall tip height of 136.5m), met mast, tracks, sub-station, temporary compound, hardstanding, laydown area, control building, cabling, up to 18 hectares of forestry, and associated works with an operational lifetime of 30 years.
Monaghan County Council
Urban regeneration proposals, including demolition of buildings, new structural walls/facades, urban spaces/streets, new public realm, potential development areas, utility improvements, alterations of parking, regrading of land, and associated site works
Serendale Limited
457 apartments in 4 no. blocks ranging in height from 4-12 storeys with 2 no. retail/cafe/restaurant units, 1 no. childcare facility, 1 no. community facility and all associated development
Glenveagh Homes Ltd.
The proposed devleopment is for a Strategic Housing Development for the construction of 289. no residential units, a creche and all ancillary site development works. An EIAR and NIS have been prepared in respect of the proposed development.
Evergreen Agricultural Enterprises Ltd
The development, on a site of approx. 7.9Ha, consists of the provision of a renewable biogas and biofertiliser production facility with an intake of up to 165,000 tonnes of feedstock per annum that will feed into the existing Gas Networks Ireland network.
Brickmount Ltd
A fifteen (15) year planning permission for continuation of the operational life of the existing wind farm (SCC Ref. 03/619 & ABP Ref. 21.204790, as amended by SCC Ref 10/371 & 10/388) from the date of expiration (March 2024) of the current permissions.
Pinewood Wind Limited
Amendments to the permitted Pinewoods Wind Farm to include amendments to wind turbine component dimensions and minor re-siting of 3 no. turbines.
Edgeconnex Ireland Ltd.
Two no. adjoined single storey data centres and ancillary elements with a total gross floor area of 15,274sqm
Ventaway Limited
24 storey building including arts centre, offices and gym (overall gross floor area of 35,910 sq.m.) with all associated development
Clarochem Ireland Limited
expansion to existing facility, warehousing, R&D Labratory, expansion to offices, product finishing building, engineering offices and chemical storage