Major projects
Ireland's biggest construction and infrastructure projects, from the first filing
Ireland's largest construction and infrastructure projects: every consent application accompanied by an Environmental Impact Assessment (EIAR) since 2017, across all consent regimes (An Coimisiún Pleanála, foreshore, roads, rail, waste). The major schemes, geocoded, with the applicant and the consent link.
The largest of these are consented directly by An Coimisiún Pleanála, the national planning body that replaced An Bord Pleanála.
2,033 projects tracked · updated weekly · page 17 of 41, projects 801 to 850
Updated weekly from the national EIA portal, so new schemes land here as the portal publishes them. Follow the strategic cases through the An Coimisiún Pleanála tracker and the infrastructure feed.
· checked against the sources below
Search and filter the full feed by regime, sector, keyword and linear schemes inside the app, and see every project on the map with the Pro major projects layer.
Sign in freeUtilities, civils or network-planning team? See your patch (grid, water, transport and energy schemes from first filing) in a 20-minute walkthrough, or read what PlanningLeads does for utilities, civil engineers and the public sector.
Book a demoPrivate applicant
Mannok Cement Ltd
Quarrying operations including the extraction of sand and gravel over a 19.3ha area to a depth of up to 54mAOD for a period of up to 20 years and all ancillary works related to the same with restoration of the site to biodiversity and agricultural uses.
Milford Quarries Limited
Demolition of existing disused buildings & the development of a dimension stone quarry with a projected lifetime of c. 14 years (12 13 years operational with an additional 1-year to allow for the implementation of a restoration plan).
Hayfield Homes Ltd.
Construction of 77 no. residential units comprising 1 no. three storey duplex block (8 no. units) and 69 no. two storey houses together with public open space, accesses and upgrade works along the Enfield Relief Road.
HPREF Dublin Office DevCo 1 Limited
Construction of a light industrial / warehouse (including wholesale use) / logistics building (Unit F1) with a gross floor area (GFA) of c. 14,561 sq. and and associated and ancillary development.
B&N Renaghan Enterprises DAC
Construction of 1 No. poultry house and No. 1 roofed manure shed together with ancillary structures (to include meal storage bin and underground soiled water tank) and associated site works
Ballybane Windfarms 2 Ltd
Wind farm consisting of 7 No. turbines with tip heights of 150 metres, substation, roads, hardstands, widening on junctions on the public road for turbine delivery.
Private applicant
Railway works from Hazelhatch to city centre largely on existing railway lines(approx 20km). Works include electrification, track modifications(incl widening), bridge modifications&reconstructions, soil nailing into substratum and new Heuston West Station
McKeon Stone Ltd.
Planning permission of 27yrs sought for continued use and extension of existing dimension stone quarry & provision of new maintenance workshop (160sq.m.) within application area of 15.8ha. and restoration to ecological/agricultural afteruse.
Better Value Unlimited Company
The proposed development will consist of the overall demolition of existing buildings and structures on site and the construction of a shopping centre
RWE Renewables Ireland Limited
Construction of 8 no. wind turbines, 1 no. permanent meteorological mast, 1 no. onsite 38kV electrical substation and medium voltage (38kV) electrical cabling and communication cabling underground along the public road and all other associated site works.
Private applicant
The proposed development will consist of the construction of a modern c.1,010m2 Active Pharmaceutical Ingredient (API) manufacturing facility with a parapet height of c.14.63m. The proposed development will replace part of an existing API building. It represents a modification to a SEVESO (lower-tier) site and requires an industrial emissions (IE) licence.
Cloghercor Wind Farm Ltd.
Renewable energy development - 19 turbine wind farm including a 110kV substation, a connection to the national grid and all ancillary works as a Renewable Electricity Development. The proposal also includes an amenity trial for recreational use.
Knocknamork Limited.
The provision of 7 no. wind turbines with an overall ground to blade tip height of 175m (an increase of 25m, from 150m), a rotor blade length of 75m and a hub height of 100m, and all associated site development and ancillary works.
Starrus Eco Holdings Ltd
Increase the permitted annual waste intake from 270,000 tonnes to 450,000 tonnes and install an odour control unit with an 18m high stack.
Enrich Environmental Ltd.
The development of a composting, soil blending and timber recycling facility which will accept up to 95,000 tonnes of waste materials per annum.
Umma More Limited
Up to 9 no. wind turbines (max blade tip height 185 metres); underground cabling; mast; upgrades to existing roads; provision of access roads; temporary construction compound; spoil mangement; site drainage; tree felling; and all associated works.
Better Value Unlimited Company
The proposed development will consist of the overall demolition of existing buildings and structures on site and the construction of a shopping centre
Sheskin South Renewables Power DAC
21 no. turbines (max blade tip height 200m), underground cabling,mast, upgrade of existing roads, provision of access roads, borrow pits, peat management, temporary construction compounds, amenity works, tree felling, and associated works
John Nulty Ltd
John Nulty Ltd intends to apply for a 20 year permission to complete extraction of material granted within existing quarry envelope as per previously approved planning (Ref No.051801) alterations to boundaries & all associated site works.
P&S Civil Works Ltd.
Planning permission of 17yrs sought for quarry extension previously permitted under P. Ref. 12/101, for rock extraction and associated processing over an area of c. 4 ha within application area of c. 4.9 ha. & restoration to water body and wildlife area.
Coillte Teoranta
Peatland restoration project. Please find the complete development description attached to this form.
Better Value Unlimited Company
The proposed development will consist of the overall demolition of existing buildings and structures on site and the construction of a shopping centre
Umma More Limited
Up to 9 no. wind turbines (max blade tip height 185 metres); underground cabling; mast; upgrades to existing roads; provision of access roads; temporary construction compound; spoil mangement; site drainage; tree felling; and all associated works.
Private applicant
Planning permission to demolish existing mushroom tunnels, extend existing poultry house and to construct 1 poultry house and 1 No. general purpose store together with all ancillary structures and site works.
EP Energy Developments Ltd.
Open Cycle Gas Turbine power plant (350MW) and associated infrastructure
Feirm Farraige Oilean Chliara Teo
Application for renewal and review of salmon aquaculture li cence T1058/8B at Portlea, Clew Bay, Co. Mayo. Total site area to include moorings is 124.7ha.
Comhlucht Iascaireachta Fanad Teoranta
Application for a salmon aquaculture licence in Lough Swilly, Co. Donegal at a location previously operated under a trial licence in 1994. Total site area to include moorings is ca 28.8 ha.
Comhlucht Iascaireachta Fanad Teoranta
Application for renewal and review of salmon aquaculture licence T12/85B in Lough Swilly, Co. Donegal. Total site area to include moorings is ca 36.0 ha.
Comhlucht Iascaireachta Fanad Teoranta
Application for renewal and review of salmon aquaculture licence T12/85B in Lough Swilly, Co. Donegal. Total site area to include moorings is ca 36.0 ha.
Feirm Farraige Oilean Chliara Teo
Application for renewal and review of salmon aqua culture licence T10/54A & B in Clew Bay, Co. May o. Total site area to include moorings is ca 32 ha.
Better Value Unlimited Company
The proposed development will consist of the overall demolition of existing buildings and structures on site and the construction of a shopping centre
Flamewood Ltd
Flamewood Ltd intends to make an application for planning permission for development at a site on the Monaghan Road (R183), Moraghy, Castleblayney, Co. Monaghan. The application site comprises in part of a former quarry on the southern side of the R183.
Tullaghmore Wind Farm Limited
The Development consists of the erection of 6 no. wind turbines with an overall ground to blade tip height of 185m and assoiciated infrastructure. There will also be a 38kV substation and peat storage and restoration areas.
Electricity Supply Board
Construction and installation of an Open Cycle Gas Turbine (OCGT) generating unit and associated plant and equipment.
Crag Digital Avoca Limited
Demolition of existing structures and construction of 3 no. ICT facilities, a power trunk building, transformer compound and a water tank compound area and all associated development.
Flamewood Ltd
The proposed development consists of the construction of a new food production facility on a site extending to c.7.96 Hectares
Electricity Supply Board
Construction and installation of an Open Cycle Gas Turbine (OCGT) generating unit and associated plant and equipment.
SDC Piperstown II Limited
Demolition of existing structures and construction of a data centre building, energy centre, district heating centre, and all associated development.
Blessington Stone & Concrete Plant Hire Ltd t/a Rhyne Rock
Planning Permission for a total area of 18.6 Ha consisting of the extraction of rock by blasting means down to a level of 20mOD, erection of plant & buildings, landscaping, entrance & acess road construction & restoration works
Electricity Supply Board
Construction and installation of an Open Cycle Gas Turbine (OCGT) generating unit and associated plant and equipment.
Tesco Ireland Limited
Development will consist of a single storey retail unit (c.5,197 sq.m GFA), drive thru café (c.174 sq.m GFA), petrol filling station, car wash, Click and Collect facility, parking, pedestrian linkages, landscaping, signage, substation and all site works
RWE Renewables Ireland Limited
Construction of 8 no. wind turbines, 1 no. permanent meteorological mast, 1 no. onsite 38kV electrical substation and medium voltage (38kV) electrical cabling and communication cabling underground along the public road and all other associated site works.
Firth Developments Unlimited Company
Development comprising of 419no. residential units, consisting of 167no. 1-bed units, 199no. 2-bed units and 53no. 3-bed units and residential amenity space (c. 359.5 sq. m) in 4no. Blocks ranging in height from 4 to 6 storeys.
Electricity Supply Board
Construction and installation of an Open Cycle Gas Turbine (OCGT) generating unit and associated plant and equipment.
Private applicant
Permission for the following works: Demolition of existing dwelling house and detached domestic shed and decommissioning of existing septic tank, Provision of a replacement split-level house with detached garage, Provision of an effluent treatment system
Kilsaran Concrete Unlimited Company (trading as Kilsaran)
Planning permission of 17yrs sought for sand & gravel extraction (wet working), processing plant, & provision of upgraded site entrance within application area of 58.7ha. & restoration to an ecological/lake afteruse.
University College Cork & Tyndall National Institute
Construction of a circa 65m long x 3.5-4.5m wide tri span bridge on two structural piers connecting the existing Tyndall National Institute campus on the south to Tyndall National Institute’ s New Facility on the North (subject to OPW Section 50 approval).
Marina Quarter Limited
Amendments to permitted application WMCC reg Ref. 14/7103/ ABP Ref. PL25.244826 for the removal of 38 no. permitted units and the construction of 70 no. residential units
Private applicant
An extension and modifications to the permitted Biopharmaceutical Manufacturing Facility [Planning Application reference Number 21/701], currently under construction.