Major projects
Ireland's biggest construction and infrastructure projects, from the first filing
Ireland's largest construction and infrastructure projects: every consent application accompanied by an Environmental Impact Assessment (EIAR) since 2017, across all consent regimes (An Coimisiún Pleanála, foreshore, roads, rail, waste). The major schemes, geocoded, with the applicant and the consent link.
The largest of these are consented directly by An Coimisiún Pleanála, the national planning body that replaced An Bord Pleanála.
2,033 projects tracked · updated weekly · page 24 of 41, projects 1,151 to 1,200
Updated weekly from the national EIA portal, so new schemes land here as the portal publishes them. Follow the strategic cases through the An Coimisiún Pleanála tracker and the infrastructure feed.
· checked against the sources below
Search and filter the full feed by regime, sector, keyword and linear schemes inside the app, and see every project on the map with the Pro major projects layer.
Sign in freeUtilities, civils or network-planning team? See your patch (grid, water, transport and energy schemes from first filing) in a 20-minute walkthrough, or read what PlanningLeads does for utilities, civil engineers and the public sector.
Book a demoDempsey Sand and Gravel Ltd
It is proposed to extract sand and gravel materials at the site located in Walterstown, Hollywood, Co. Wicklow. Total site area is 20.308Ha and the extraction area is 17.79Ha.
Slieveacurry Limited
8 no. wind turbines (overall ground to blade tip height in the range of 175m max to 173m min); Uderground cabling; Connection to and extension to the Slievecallan 110kV substation; New site access; Forestry felling; associated works
Dempsey Sand and Gravel Ltd
It is proposed to extract sand and gravel at a rate of approximately 70,000 tonnes per annum at the proposed quarry site. Total site area is 20.308ha and the extraaction area is 17.79Ha.
Annagh Wind Farm Limited
Construction of 6 no. wind turbines, drainage infrastructure; road upgrades; onsite substation; site compound; underground grid connection to the Charlevile 110kV substation; 1 no. meteorological mast; and all other associated site works
Steinfort Investments Fund
349no.residential dwellings, creche and two neighbourhood centre buildings, open space and associated infrastructure and site development works
Private applicant
Construction of a poultry house, soiled water storage tank and all associated site works.
Private applicant
The development will consist of the Construction of a poultry house, soiled water storage tank, machinery store and carry out all associated site works.
Waterford City and County Council
c.1.1km of overground & underground flood protection measures & drainage upgrades at Plunkett St., Rice Bridge roundabout & approach roads. Remedial works to existing quay wall. Construction of riverside & landside sheet pile wall to protect rail line
Sure Partners Limited
The Proposed Development will comprise Arklow Bank Wind Park Phase 2 Operations and Maintenance Facility Onshore and Nearshore Infrastructure and associated works
Eli Lilly Kinsale Limited
10-year Permission for development comprising of an extension to and modifications to a permitted pharmaceutical manufacturing building known as IE2B (permitted under Pl. Reg. Ref. 19/6029); ancillary tanks, extension to berm & other ancillary works
PSE Seven Heads Limited
To leave in situ all infield pipelines and umbilicals and install protective materials
PSE Kinsale Energy Limited
To leave in situ all infield pipelines and umbilicals and the 24” export pipeline (offshore and onshore section), to fill the onshore section of the 24” pipeline with grout and to install protective materials.
Land Development Agency
The project consists of advance infrastructure works on a 1.57 hectare site at Balbriggan, Hampton Demesne and Kilsough North townlands, Balbriggan, Co. Dublin to facilitate future residential development on lands covered by the Casltelands Masterplan.
The Electricity Supply Board (ESB)
Remove c.9.5km of overhead line (OHL) relating to the existing windfarm grid connection works. Develop the full length of a new grid connection over c.14.8km, using a combination of OHL (c.9.8km) and underground cables (c.4km) & ancillary works.
Lagan Materials Ltd.
Permission sought for deepening the existing quarry from -20mOD to -50mOD within the existing permitted quarry footprint (P. Ref. No. S/02/5476; ABP Ref. PL04.203762; & ABP Ref. PL04.QD.0010) within an applicaiton area of 12.6 hectares.
ABO Wind Ireland Limited
Construction of up to 7 No. wind turbines with a maximum overall tip height of 150m, 1no. permanent Met Mast, 1no.38kV electrical substation, connection to National Grid at the existing Stratford 38/110kV substation and all associated works
Gromane Limited
The installation of 2250 metres of 38KV underground grid connection comprising cable ducting and associated electrical cabling and all other ancillary works including joint bays, culverts, maker posts and all associated development
Ballynagare Wind Farm Limited
The development comprises of the construction of 7 no. wind turbines (max height of 170m), provision of 1 no. permanent meteorological mast with a height of 10m, upgrade of existing roads and access junctions, 1 onsite 38kV substation and grid connection
Ballynagare Wind Farm Limited
The development comprises of the construction of 7 no. wind turbines with a max height of 170m, provision of 1 no. permanent meteorological mast with a height of 110 metres, upgrade of existing roads and access junctions, 1 onsite 38kV substation
Booth Precast Products Ltd.
Area of 8.5 Ha. comprising of: Removal of vegetation and overburden; Extraction of sand and gravel; Upgrading of existing entrance and site lines; Construction of screening berms, wheel wash & refueling area; Landscaping and restoration; 10 yr permission.
Voyage Property Limited
Proposed Strategic Housing Development comprising 371 no. residential units and associated development, including a new access road
Comhlucht Iascaireachta Fanad Teoranta
Application for renewal and review of salmon aquaculture licence T12/77A in Mulroy Bay, co. Donegal
Comhlucht Iascaireachta Fanad Teoranta
Application for renewal and review of salmon aquaculture licence T12/77 (78) in Mulroy Bay, Co. Donegal.
Comhlucht Iascaireachta Fanad Teoranta
Application for renewal and review of salmon aquaculture licence T12/77 B&D in Mulroy Bay, Co. Donegal
HPREF HSQ Investments Ltd
Residential development of 399 no. ‘Build To Rent’ residential units and all ancillary and associated uses, development and works, and a retail unit of 120 sq m, on a site of 1.08 ha.
Comhlucht Iascaireachta Fanad Teoranta
Application for renewal and review of salmon aquaculture licence T12/77 E in Mulroy Bay, Co. Donegal.
Comhlucht Iascaireachta Fanad Teoranta
Application for renewal and review of salmon aquaculture licence T12/77 C in Mulroy Bay, Co. Donegal
Comhlucht Iascaireachta Fanad Teoranta
Application for renewal and review of salmon aquaculture licence T12/77/7 in Glinsk, Mulroy Bay, Co. Donegal.
Private applicant
Extension to existing Caravan Park to provide 63 no.additional caravan pitches and 7 no.log cabins. Associated site works including new foul effluent treatment system with connection to public sewer and new storm water system.
Bracklyn Wind Farm Limited
Construction and operation of a 9 turbine wind farm, a110kV electrical substation and associated electrical grid connection, and all associated ancillary infrastructure and developments.
Guerbet Ireland ULC
Expansion and development of an existing bulk pharmaceutical manufacturing plant. The Construction Phase for the long-term capacity expansion project will be undertaken in a phased manner over a period of ten (10No.) years
Lagan Materials Ltd
"Continued use and operation of existing quarry including deepening of the quarry. Extraction will be confined to the existing permitted quarry area (P.A. Ref. 10/383) comprising an extraction area of c. 14.5 ha within the full landholding of c. 19.6 ha."
LUMCLOON ENERGY LIMITED
A proposed grid connected Energy Storage System (ESS) plant comprising Battery Energy Storage System (BESS) compound, synchronous condenser compound, new access road from the R446, internal roads, fencing & assocated electrical equipment & site services.
Homeland Silverpines Limited
The development will consist of a new residential and mixed use scheme to include apartments, residential amenity space, a café and a childcare facility.
ABO Wind Ireland Limited
Construction of up to 7 No. wind turbines with a maximum overall tip height of 150m, 1no. permanent Met Mast, 1no.38kV electrical substation, connection to National Grid at the existing Stratford 38/110kV substation and all associated works
Private applicant
Exisiting Salmon Farm license renewal applications AQ 303 / File No. T06/064
Murphys Irish Seafood LTD
Exisiting Salmon Farm license renewal applications AQ 425 / File No. T06/064/7
Murphys Irish Seafood LTD
"Two exisiting Salmon Farm license renewal applications AQ321 REF T5/122 T5/122A."
XMR Energy Limited
Electrical grid connection (Overhead line and underground cable) from the permitted Crossmore Wind Farm to the Booltiagh substation, including roads and access arrangements/works, alterations to the permitted wind farm infrastructure, forestry felling
Feirm Farraige Oilean Chliara Teo
Application for renewal and review of salmon aquaculture licence T10/67A in Clew Bay, Co. Mayo. Total site area to include moorings is ca 19.7 ha
Huntstown Power Company Limited
Construction of a 2 storey 220 kV (GIS) substation (c.2,068 sqm total gross floor area) with an overall height of c.17). Lightning electrodes are attached to the roof of the substation building resulting in an overall height of c.20m. The compound include
Feirm Farraige Oilean Chliara Teo
Application for renewal and review of salmon aquaculture licence T1058/8B at Portlea, Clew Bay, Co. Mayo. Total site area to include moorings is c123.1ha
Comhlucht Iascaireachta Fanad Teoranta
"Application for renewal and review of salmon aquaculture licence T10/58/04 at Kinacorra, Clew Bay, Co. Mayo. Total site area, to include moorings is 48.45ha."
Private applicant
Construct an additional poultry unit on previously approved site (Ref P. 20/462), together with vertical meal bin, hardened areas, underground wash tanks and all ancillary site works
Donegal County Council
Construction of a community park including pavilion, multi-function outdoor space, play areas, walkways, cycleway, landscaping, access roads and parking, amenity lighting, maintenance compound, spectator stand, accommodations works and ancillary works.
Donegal County Council
Construction of a pedestrian and cycle bridge 115m in length between Lifford and Strabane (the adjacent eastern section of the proposed community park at Strabane, County Tyrone).
Tara Pig Farms ltd.
Permission to construct, A) 2 No. New pig houses, B) extensions to 3 No. existing pig houses, and, C) 4 No. ancillary overground/underground storage tanks together with all ancillary structures and associated site works.
Cuilfeach Teoranta
Wind farm consisting of eight wind turbines, a grid connection, a substation, a meteorological mast, peat recovery areas, access tracks & hardstands, a temporary compound and existing road strengthening and a new road section for delivery purposes.
Steinfort Investments Fund
349no.residential dwellings, creche and two neighbourhood centre buildings, open space and associated infrastructure and site development works.
Grey Ruby Limited
Twenty-year permission for the importation and recycling of up to 80,000 tonnes of Construction and Demolition (C&D) material per annum; the restoration of existing quarry using up to 200,000 tonnes per annum of imported inert material