Major projects
Ireland's biggest construction and infrastructure projects, from the first filing
Ireland's largest construction and infrastructure projects: every consent application accompanied by an Environmental Impact Assessment (EIAR) since 2017, across all consent regimes (An Coimisiún Pleanála, foreshore, roads, rail, waste). The major schemes, geocoded, with the applicant and the consent link.
The largest of these are consented directly by An Coimisiún Pleanála, the national planning body that replaced An Bord Pleanála.
2,033 projects tracked · updated weekly · page 22 of 41, projects 1,051 to 1,100
Updated weekly from the national EIA portal, so new schemes land here as the portal publishes them. Follow the strategic cases through the An Coimisiún Pleanála tracker and the infrastructure feed.
· checked against the sources below
Search and filter the full feed by regime, sector, keyword and linear schemes inside the app, and see every project on the map with the Pro major projects layer.
Sign in freeUtilities, civils or network-planning team? See your patch (grid, water, transport and energy schemes from first filing) in a 20-minute walkthrough, or read what PlanningLeads does for utilities, civil engineers and the public sector.
Book a demoLand Development Agency
railway line,1 no. creche facility, 2 no. retail units, open space and all associated infrastructure.
Gerard Gannon Properties
Demolition of derelict structures on site and the construction of 421 no. residential units, 1 no. childcare facility, 2 no. retail units, 2 no. community rooms, and all associated site works necessary to facilitate the development
Electricity Supply Board (E.S.B)
75 MW Battery Energy Storage System (BESS) and a 200 MVA Synchronous Condenser
Private applicant
Routed along the R107 Malahide Road from Mayne River Avenue Junction to the junction with Marino Mart - Fairview and also via Brian Road,Carleton Road, St Aidan’s Park, Haverty Road and Marglann Marino
Electricity Supply Board (E.S.B)
Demolition of the disused power station and associated site structures; overall site reminstatement; and development of a 75 MW Battery Energy Storage System (BESS) and a 400 MVA Synchronous Condenser
Estuary View Enterprises 2020 Limited
the demolition of 10 no. existing agricultural buildings/sheds and log cabin residential structure and the construction of a residential development of 140 no. apartment units resident amenity facilities, crèche, and all ancillary site development works.
Estuary View Enterprises 2020 Limited
facilities, café, crèche, and all ancillary site development works.
Lismore Homes Limited
Construction of 1,007 apartments 6 no. communal residential community rooms, and creche in 16 no. buildings with varying heights , basement and surface level car parking, secure bicycle parking, landscaping, wwater supply connection at Red Arches Road.
sen Manufacturing Ireland Ltd.
Construction of a two storey extension of 1360sqms for use a pharmaceutical manufacturing building. Includes PPC Licence PO-117-02.
Dundrum Retail GP DAC
Strategic Housing Development - The development will consist of a total gross floor area (gfa) of 88,442.0sqm comprising 881 apartments and ancillary accommodation totalling 83,983.3sqm GFA) and 4,458.7sqm of non-residential uses.
Merck Millipore Ltd
The demolition of an existing switch room and an existing drum store and the construction of a new 3 storey manufacturing building, a two storey Utilities Building, a single Drumstore, expansion to WWTP and Tank Farm with all associated site works.
Cairn Homes Properties Limited
The development will consist of the construction of a strategic housing development comprising 586 residential units, a community building, a crèche, a sport field, a MUGA, a distributor road and all associated ancillary development works
Private applicant
Permission to construct serviced dwelling house and domestic garage. This application is accompanied by a Natura Impact Statement.
Private applicant
Permission to construct serviced dwelling house and domestic garage. This application is accompanied by a Natura Impact Statement.
The Land Development Agency
Strategic Housing Development for 977 no. residential units and 3,889 sq m of non-residential floorspace.
Balscadden GP3 Limited
associated residential tenant amenity, 1 no. retail unit and 2 no. café/retail units, car and bicycle parking, open space and public realm.
Revington Dvelopments Ltd.
A 4ha site providing - 363 no. Build to Rent Apartments, 61 no. Student Apartments (189 bedspaces), 18 no. Houses, Creche and Management Facilities Building, Cafe and 3 no. Retail Units, Landscaping and all site works.
Kelland Homes Ltd & Durkan Estates Ireland Ltd
655 no. dwellings, comprised of 257 no. 2, 3 & 4 bed houses, 152 no. 1, 2 & 3 bed duplex units, 246 no. 1, 2 & 3 bed apartments, creche & all assocaited site development works
Steeplefield Limited
commercial development comprising 633 no. build-to-rent apartment units 1 no. childcare facility and 10 no. commercial units in 4 no. blocks (A-D) ranging in height from 5 to 12 storeys
Private applicant
Development of a new Sterile Manufacturing Facility at the site of the existing biologics formulation and filling facility.
Coolberrin Wind Limited
Amendments to the permitted Mountain Waters Wind Farm to include modifications to turbine floor levels; omission of access track; realignment/replacement of underground electrical cables; and temporary haul route upgrade works
Coolberrin Wind Limited
track; realignment/replacement of underground electrical cables; and temporary haul route upgrade works
DW Raheen Developments Ltd
384 residential units on a site of 10.44ha consisting of 202 no. houses and 182 no. apartment and duplex units, a creche facility, landscaping and all associated site development works
Goldwing Real Estate Plaza Ltd.
construction of 5 no. five storey office buildings organised around a landscaped public park with pedestrian plazas and vehicle circulation. The buildings are over 2 separate single level basements east and west bisected by the Carysfort/Maritimo culvert.
Private applicant
The provision of wastewater collection systems and treatment facilities in the Cork Lower Harbour area, with the wastewater treatment plant treating waste from Carrigaline,Crosshaven,Shanbally,Coolmore,Ringaskiddy, Passage West,Glenbrook, Monkstown & Cobh.
The Ardee Partnership
Residential development of 272 dwellings (206 dwellings & 66 duplex apartments), public park, creche, community building, realigned watercourse and riparian corridor, access, parking, landscaping, public open space and all associated infrastructure.
ilsaran Concrete Unlimited Company
Continued extraction of rock quarry, continued use of readymix concrete plant & waste recovery facility, a quarry extension, an increase in waste intake volume to waste recovery facility, changes to quarry operations' operating hours,other associated works
Blanche Retail Nominee Limited
Construction of a mixed use development comprising six blocks of 5 to 13 storeys in height, including 352 no. apartments and resident amenity floorspace, 5 no. commercial units, a community facility, extension and alteration of the existing MSCP
B&N Renaghan Enterprises DAC
Construct 1 No. poultry house and No. 1 roofed manure shed together with ancillary structures (to include meal storage bin and underground soiled water tank) and associated site works at Shanemullagh, Clontibret, Co. Monaghan
Miltown Composting Systems Ltd.
The proposed development is for an increase in throughput of organic material from 50,000 tonnes per annum to 75,000 tonnes per annum. It will also include for the reconstruction and extension of old agricultural sheds as organic material maturation sheds
TBEB Ltd.
Restoration of a disused rock and gravel quarry comprising some 3.26 hectares to agricultural use using imported inert soil and stone classified as Article 27 by-products of the construction.
Pembroke Beach DAC
The construction of a residential and mixed-use scheme comprising a floor area of 43,944 sq m including inter alia 356 No. apartments.
Watfore Limited
Demolition of existing structures, construction of 352 no. apartments, 257 no. Build to Rent apartments, creche and associated site works.
Morriscastle Strand & Camping Park Ltd
permission for an Extension of 30 units to Existing Mobile Home Park, provide Open Green Children's Play Areas, provide a Communal Amenity, Woodland, construct a Pond. Provide 8 No Camping Pods
Private applicant
Planning permission to demolish 1 No. Poultry house, and, to construct 1 No. poultry house together with all ancillary structures (to include meal storage bin(s) and soiled water tank(s)) and site works.
Goldwing Real Estate Plaza Ltd.
construction of 5 no. five storey office buildings organised around a landscaped public park with pedestrian plazas and vehicle circulation. The buildings are over 2 separate single level basements east and west bisected by the Carysfort/Maritimo culvert.
Private applicant
Continuation of use of existing quarry through extraction to a finished level of 45 mAOD and extension over new area of 2.29 Ha, together with associated works including settlement lagoons and new surface water discharge point.
Private applicant
N63 Liss to Abbey Realignment Scheme, comprising construction of 2.3km of National Secondary Road including the provision of a bridge over the River Abbert, and incorporating pedestrian and cycle provisions along the existing N63
Eli Lilly (Kinsale) Limited
The construction of a new biopharmaceutical manufacturing campus within an existing IDA Industrial Estate.
Private applicant
Planning permission to decommission/demolish 1 No. existing poultry house and to construct 1 No. poultry house together with all ancillary structures (to include meal storage bin(s) and soiled water tank(s)) and site works.
Vantage Data Centers DUB11 Ltd.
Two no. underground 110kV transmission lines and a 110kV Gas Insulated Switchgear (GIS) substation (to be known as Kilcarbery).
LUMCLOON ENERGY LIMITED
Provision of a 220kV GIS substation and associated underground transmission cables.
Briargate Developments Newbridge Limited
Strategic Housing Development comprising 336 residential units, childcare facility and associated infrastructure
Lagan Materials Ltd
01/525), including deepening of the quarry on c. 11.4 ha. The development will include provision of new site infrastructure, including water management system, wheelwash and other ancillaries.
Futurenergy Glenard Designated Activity Company
connection to the national grid, 1no. met mast (104m in height), upgrade of tracks/roads & new access, all assoc. works
Cloghroe Development Limited
Mixed-use residential and retail development comprising of 198 no. residential units, creche, café and retail food store.
Kilsaran Concrete Unlimited Company (trading as Kilsaran)
Planning permission of 22yrs sought for sand & gravel & rock extraction, processing plant, concrete batching plant & provision of new site entrance within application area of 71.3ha. & restoration back to a combined ecological/agricultural afteruse.
Comhlucht Iascaireacht Fanad Teoranta
Renewal and review of Aquaculture licence T12/96 (AQ286)
Ballinagree Wind DAC
Construction of a wind farm consisting of 20 no. wind turbines, on-site substation, grid connection and all related site works and ancillary development.
Saint-Gobain Mining Ireland Limited
Extraction of gypsum from former (Drumgoosat) underground mine at Knocknacran West by open-cast mining, continued restoration of existing Knocknacran Mine and construction of a new Community Sports Complex