Major projects
Ireland's biggest construction and infrastructure projects, from the first filing
Ireland's largest construction and infrastructure projects: every consent application accompanied by an Environmental Impact Assessment (EIAR) since 2017, across all consent regimes (An Coimisiún Pleanála, foreshore, roads, rail, waste). The major schemes, geocoded, with the applicant and the consent link.
The largest of these are consented directly by An Coimisiún Pleanála, the national planning body that replaced An Bord Pleanála.
2,033 projects tracked · updated weekly · page 34 of 41, projects 1,651 to 1,700
Updated weekly from the national EIA portal, so new schemes land here as the portal publishes them. Follow the strategic cases through the An Coimisiún Pleanála tracker and the infrastructure feed.
· checked against the sources below
Search and filter the full feed by regime, sector, keyword and linear schemes inside the app, and see every project on the map with the Pro major projects layer.
Sign in freeUtilities, civils or network-planning team? See your patch (grid, water, transport and energy schemes from first filing) in a 20-minute walkthrough, or read what PlanningLeads does for utilities, civil engineers and the public sector.
Book a demoGreenlink Interconnector Limited
Installation of two high voltage directional current power cables and a fibre optics cable under the seabed between EirGrid’s Great Island substation in County Wexford (Ireland) and the National Grid’s Pembroke substation in Pembrokeshire (Wales).
Westar Investments Ltd.
A Strategic Housing Development involving construction of a residential housing scheme comprising 112 no. houses, 159 no. apartments and 34 no. duplex units (providing a total of 305 no. residential dwellings), a 340sqm crèche and a public park.
Ardstone Homes Limited
Demolition of existing structures on site and the construction of a mixed-use scheme comprising 590 No. residential units, ancillary residentail support facilities, two retail units and two cafe/restaurants and all associated site works.
South Dublin County Council
South Dublin County Council is applying for a retrospective Waste Licence to regularise the existing soil recovery facility located on site. The proposal is for material to remain in situ with no proposed removal/importation of material to/from the site.
Aeval Unlimited Company
The proposed development consists of a residential-led development comprising 685no. residential units ranging from 2 - 8 stories, 1no. childcare facility, a temporary surface car park to serve future DART Station and 2no. replacement golf holes.
Electricity Supply Board (ESB)
A c. 200m long medium/low voltage (MV/LV) underground cable installed in underground cable ducting in a c. 1m wide trench of depth c. 1m, connecting the existing ESB network within the former Diamond Innovations site to the existing ESB Darndale substation
Progressive Commercial Construction Ltd
A Strategic Housing Development of 201no. Build To Rent apartments in a building that ranges in height from 8 to 11 to 24 storeys over ground floor, ancillary resident & communal facilities; cafe; private rented office; public bar/restaurant; basement
CAIRN HOMES PROPERTIES LTD
Mixed use development comprision 354 no. residential units, 2 employment buildings, a permanent bus layby along with car parking and all associated works, car parking, drainage, and boundary treatments.
Drumlins Park Limited
Development of 8 wind turbines, each with a maximum tip height of up to 180metres; and all associated site development and ancillary works including turbine foundations, hardstands, access tracks, one meteorological mast and haul route upgrade works.
Private applicant
Pfizer intends to (i) introduce new production processes for the manufacture of Gastrointestinal Therapeutic System (GITS) products, (ii) provide additional capacity at the existing Technology Innovation Centre (TIC) and (iii) provide a new steam boiler.
Architectural and Metal Systems Limited
construction of a new single-storey extension for the surface treatment (anodising) of aluminium sections, underground services and associated site works
Private applicant
The Project (proposed development) will comprise a new Wastewater Treatment Plant (WwTP), associated infrastructure including the interceptor sewer network and marine outfalls as well as an upgrade to the existing coastal revetment.
WuXi Vaccines Ireland Limited
The proposed development consists of an integrated Pharmaceutical manufacturing facility located directly North of the Wuxi Biopharmaceutical campus currently under construction.
Electricity Supply Board (ESB)
A c.1m wide trench of depth c.1m within a c.4m wide corridor in which underground cable ducts and cables will be installed, being 2 linear cable installations of c.3km and c.3.4km
Cairn Homes Properties Limited
The development will consist of the construction of a residential development of 314 no. dwellings, a creche (c. 610 sq. m), retail (c. 169 sq. m), open space 1.32 hectares.
CREKAV TRADING GP LIMITED
The Proposed Development is for the construction of a residential development to accommodate apartments and residential amenity spaces, located on lands east of St Paul’s College, Raheny, Dublin 5. The Proposed Development site is c. 6.4 hectares.
Shannon Homes Drogheda Ltd
Strategic Housing Development comprising 357 residential units, a childcare facility, roads, infrastructure, open space, and all associated development.
Shorevale Investments Ltd.
Mixed-use development (comprising residential, office, crèche, community, retail, cafe/bar/restaurant uses), in 9 No. blocks 7-18 storeys over basement level; c.129,210m2 Gross Floor Area, plus 38,399 m2 ancillary floorspace.
Hines Cherrywood Development Fund ICAV
Construction of a Public Park known as Ticknick Park (Phase 2) on lands c.42HA. The proposed development is an extension to the permitted public park (Ticknick Park Phase 1, Reg Ref: DZ16A/0570) which is currently under construction.
Oxley Holdings Limited
The development will consist of the construction of 741 no. Build to Rent residential units in 8 no. apartment blocks ranging in height from 4 to 23 storeys with a cumulative gross floor area of 68,535sq.m including residential support amenities, etc.
Cairn Homes Properties Limited
The proposed development will comprise a residential scheme 282 residential units in 4 apartment blocks ranging in height from 3 to 7 storeys in height, the continuation of the Mayne River Linear Park and all associated development works.
KEEGAN QUARRIES LTD
It will consist of a weighbridge, wheelwash, the erection of a staff office and administration building, car park area, access road and improved site entrance, concrete and readymix batching plant, block yard and associated infrastructure.
The Electricity Supply Board (ESB)
Substitute consent for the as-constructed electricity grid connection elements, consisting of c. 9.7km of 20 kV overhead line (OHL).
Cassidy Brothers Concrete Products Ltd.
Continuation of quarrying over 17.8 Ha.; Extraction from 11.3 Ha. (within 17.8 Ha. area); Continuation of use of existing plant and infrastructure; Construction of refuelling area and lagoons; Landscaping & restoration of the quarry; 25 year permission.
Kilsaran Concrete (trading as Kilsaran Build)
Planning permission duration of 20yrs sought for continuance of use (P. Ref. 02/462) and extension of existing sand and gravel pit and provision of a new sand processing plant, over an area of 68.9 hectares with restoration back to an agricultural afteruse
Roadstone Limited
Extraction of remaining aggregate reserves and restoration of registered quarries to agricultural use, through importation of uncontaminated soils and stones from virgin, undisturbed Sites ,as designated by-product status under Article 27.
Sustainable Bio-Energy Limited
Sustainable Bio-Energy Limited intend to apply for permission for development of a Biogas plant. The biogas plant willa ccept and transform oragnic waste into renewable energy (biomethane) and organic fertiliser / soil improver (digestate).
Hines Cherrywood Development Fund ICAV
Construction of a Public Park known as Ticknick Park (Phase 2) on lands c.42HA. The proposed development is an extension to the permitted public park (Ticknick Park Phase 1, Reg Ref: DZ16A/0570) which is currently under construction.
Trailford Ltd
A Strategic Housing Development involving construction of a residential housing scheme comprising 509 no. dwellings, 152 no. apartments units (total of 661 no. residential dwellings) and neighbourhood centre, comprising of a creche, a café and retail unit
Kilsaran Concrete (trading as Kilsaran Build)
Extraction of sand and gravel using both wet and dry extraction processes at a rate of 250,000 tonnes per annum to a total extraction volume of circa three million tonnes over 12 years followed by 2 years restoration.
Ballyfaskin Enterprises Ltd
The development will consist of increased capacity of the piggery from 600 sows to 1000 sows and their progeny in addition a new electrical substation will be constructed.
Kilsaran Concrete (trading as Kilsaran Build)
Planning permission duration of 10 years sought for sand and gravel extraction, associated processing plant and upgrade works to existing site entrance over an area of 17 hectares with restoration back to an agricultural afteruse
Intel Ireland Limited
The proposed development comprises: 1. The substantial removal of an existing man made earth and stone mound, 2.The construction of a yard area housing site supporting functions, utilities and buildings, and 3. associated site works
Cairn Homes Properties Limited
The development will consist of the construction of a residential development of 426 no. dwellings, a creche (c. 599 sq. m), residential amenity building (c. 325 sq. m), active open space of 4.5 hectares, greenway of c. 2.4 hectares
JHOK Ltd Company
JHOK Limited are applying for planning permission for a Cheese manufacturing Plant and associated developments at the IDA Science and Technology Park Gorteens, Slieverue, Co Kilkenny.
Bord na Móna Powergen Ltd.
The proposed development is an anaerobic digestion facility, designed to treat biodegradable and organic material. It will include: Renewable Gas Facility, Peat deposition area and surrounding area, External and Internal Road Upgrades
Cork County Council
A two-car desynchronised reversible ropeway cableway, a mainland station, an island station, a visitor centre, a café, a car park with 100 no. parking spaces, road improvement works along the approach road R572 and all other ancillary works.
Anthony D'Arcy Ltd.
The development within an application area of c. 7.7 hectares will consist of extraction and processing of sand & gravel within an extraction area of c. 5.7 hectares to a level of c. 60mOD, and related ancillary facilities. Total duration of 10 years.
Kilsaran Concrete (trading as Kilsaran Build)
Extraction of sand and gravel using both wet and dry extraction processes at a rate of 250,000 tonnes per annum to a total extraction volume of circa three million tonnes over 12 years followed by 2 years restoration.
Wilton Scrap Metals Ltd. T/A Dolly Skip Hire
The proposed development consists of an increase in waste throughput from 21,000 to 49,500 tonnes per annum at an existing waste processing and transfer facility, facilitated by 2 additional waste processing sheds & all associated site development works.
Lightsource Renewable Energy Ireland Ltd
The construction, operation and decommissioning of a photovoltaic solar farm comprising bi-facial photovoltaic panels, substations, transformers, AC box, monitoring house, storage shed, battery units, WC, fencing, CCTV and all associated development works.
Private applicant
Permission to construct 2 no. poultry houses and 1 No. ancillary store together with all ancillary structures (to include meal bin(s), and soiled water tank(s)) and ancillary site works (to include a new/upgraded site entrance).
Cairn Homes Properties Ltd.
Demolition of all structures on site; development of 406 no. residential homes, a childcare facility, 1 no. commercial unit, new access from Main Street, continuation of Newcastle Boulevard, new Public Park and all associated site and development works.
Private applicant
Demolition of buildings on site & provision of 6 new blocks (H,J,M,N,P&Q) of 1-11 storeys to provide for 287 residential units; residential tenant amenity space; a crèche facility; and a substation.
Bord na Móna Powergen Ltd.
The proposed development is an anaerobic digestion facility, designed to treat biodegradable and organic material. It will include, Renewable Gas Facility, Peat deposition area and surrounding area, External and Internal Road Upgrades
Gerard Gannon Properties
construction of a mixed-use development (within 3 no. blocks i.e. Blocks 3 13 & 15) comprising of 420 no. apartment units (including build to rent units), 14 no. retail units, 1 no. 8 screen cinema, 4 no. cafes and 10 floors of office
Gerard Gannon Properties
construction of a mixed-use development (within 3 no. blocks i.e. Blocks 4, 5 & 14) comprising of 500 no. apartment units (including build to rent units), 1 no. creche, 1 no. community centre, 1no. men's shed, 3 no. cafes, and 6 no. retail units
Gerard Gannon Properties
construction of a mixed-use development within 9 no. blocks i.e. Blocks 6, 8, 11, 17, 25, 26, 27, 28 & 29) of 1,030 no. apartment units (including build to rent units), 2 no. creches, 10 no. retail units and 1 no. gym
Private applicant
Proposed New Replacement Poultry Unit and extension of two other poultry units on site together with all ancillary site works
Keegan Quarries Limited
Further development of the 21.64Ha quarry site to include extraction of limestone from 14.3Ha and mobile processing to a depth of 13mAOD. The continued use of structures referenced under application PL17.305049 and the restoration of the whole quarry site.