Grid & Substations
Development of a 110kV Electrical Substation and Grid Connection
County
Waterford
Planning authority
Waterford City and County Council
Case type
SID (Not incl LAP SID cases)
Lodged
October 2025
Official record: An Coimisiún Pleanála case 323791
Full project detail is a Max feature
Unlock the developer/applicant, the connection voltage, exact location, decision & status and environmental flags - plus directory filtering, the map and API/export.
Need the whole pipeline in your own GIS? Enterprise feed licence
Other grid & substations projects
- An electrical substation and associated 110kV and MV infrastructure required to connect ground mounted solar PV generation to the electricity transmission system with all associated ancillary site development work.Waterford
- 10-year permission for a 110kV electricity substation, two control buildings, radio mast, four number lattice towers, modifications and connection to the existing on-site 110kV transmission line, perimeter fencing and access gate and all ancillary development services and works.Waterford
- 10 year planning permission for a 110kV substation, underground grid connection and associated infrastructureClare
- Proposed 110 kV/ 38kV/Medium voltage (MV) electrical substation and all associated infrastructureMeath
- Proposed Development which consists of a 110kV onsite electrical substation, loop-in grid connection, and associated infrastructure and worksMayo
- Proposed 220kV Independent Power Producer (IPP) GIS substation, High Voltage Lines, Electric Plant and associated Site Development WorksWestmeath