retrofit_energyBattery StorageGrid & Substations
Proposed development of a 220kV Loop In Loop Out (LILO) Gas Insulated Switchgear (GIS) substation, Battery Energy Storage System (BESS) and associated grid connection infrastructure
County
Limerick
Planning authority
Limerick City and County Council
Case type
SID (Not incl LAP SID cases)
Lodged
September 2026
Official record: An Coimisiún Pleanála case 324642
Full project detail is a Max feature
Unlock the developer/applicant, the connection voltage, exact location, decision & status and environmental flags - plus directory filtering, the map and API/export.
Need the whole pipeline in your own GIS? Enterprise feed licence
Other battery storage projects
- A renewable energy development including 14 wind turbines, 110kV underground cabling connection, and all associated infrastructure and worksLimerick
- Proposed construction of a new 110 kV substationLimerick
- 10 year planning permission for Ballinlee Wind Farm consisting of 17 no. wind turbines, a permanent 110kV substation and ancillary developmentLimerick
- 9 no. wind turbines, grid connection and all associated site worksLimerick
- A new 110kV substation to feed into the existing Aughinish - Kilpaddoge 110kV overhead line situated within lands at Ballinknockane and Ellaha, Co. LimerickLimerick
- 10 year permission for construction of a 110kV substation and all associated works.Limerick