SolarGrid & Substations
An electrical substation and associated 110kV and MV infrastructure required to connect ground mounted solar PV generation to the electricity transmission system with all associated ancillary site development work.
County
Waterford
Planning authority
Waterford City and County Council
Case type
SID (Not incl LAP SID cases)
Lodged
May 2019
Official record: An Coimisiún Pleanála case 304558
Full project detail is a Max feature
Unlock the developer/applicant, the connection voltage, exact location, decision & status and environmental flags - plus directory filtering, the map and API/export.
Need the whole pipeline in your own GIS? Enterprise feed licence
Other solar projects
- Development of a 110kV Electrical Substation and Grid ConnectionWaterford
- 10-year permission for a 110kV electricity substation, two control buildings, radio mast, four number lattice towers, modifications and connection to the existing on-site 110kV transmission line, perimeter fencing and access gate and all ancillary development services and works.Waterford
- 10 year planning permission for a 110kV substation, underground grid connection and associated infrastructureClare
- Proposed 110 kV/ 38kV/Medium voltage (MV) electrical substation and all associated infrastructureMeath
- Proposed Development which consists of a 110kV onsite electrical substation, loop-in grid connection, and associated infrastructure and worksMayo
- Proposed 220kV Independent Power Producer (IPP) GIS substation, High Voltage Lines, Electric Plant and associated Site Development WorksWestmeath