Wind EnergyGrid & Substations
The proposed development consists of the decommissioning of 23 no. turbines and the erection of 17 no. wind turbines, underground electrical (33kV) and communications cabling connecting the wind turbines to a new on-site 110kV electrical substation and all associated infrastructure and works
County
Sligo
Planning authority
Sligo County Council
Case type
SID (Not incl LAP SID cases)
Lodged
August 2026
Official record: An Coimisiún Pleanála case 324561
Full project detail is a Max feature
Unlock the developer/applicant, the connection voltage, exact location, decision & status and environmental flags - plus directory filtering, the map and API/export.
Need the whole pipeline in your own GIS? Enterprise feed licence
Other wind energy projects
- 10 year planning permission for Gathabawn Wind Farm consisting of 12 no. wind turbines and ancillary worksKilkenny
- Proposed development of a 220kV Loop In Loop Out (LILO) Gas Insulated Switchgear (GIS) substation, Battery Energy Storage System (BESS) and associated grid connection infrastructureLimerick
- Proposed development of a 220kV Air Insulated Substation (AIS) and Loop-in Grid Connection at Greenhills Solar FarmCork
- Proposed 110 kV Substation at a site fronting onto Steeven?s Lane, Dublin 8Dublin
- 10 year planning permission for a 110kV substation, underground grid connection and associated infrastructureClare
- Proposed 110 kV/ 38kV/Medium voltage (MV) electrical substation and all associated infrastructureMeath