Planning application · Kildare County Council

for • The construction of 1 no. warehousing/industrial/logistics building (approx. 11,901…

Site 35 Rowan Tree Road , Momentum Logistics Park , Ladytown Naas

2660234 · KildareGranted
Reference
2660234
Planning authority
Kildare County Council
Received
4 Mar 2026
Decided
28 Apr 2026
Status
Granted
Use
Industrial
Site area
5.387 ha

Proposed development

for • The construction of 1 no. warehousing/industrial/logistics building (approx. 11,901 sqm total GFA and 16.37m in height) including ancillary office space, reception area, lobby, circulation areas, plant, tea stations, stores, a gym, a canteen, meeting rooms, comms room, WCs and shower facilities; • The provision of 37 no. dock levellers and 6 no. doors on grade for loading and unloading of Heavy Goods Vehicles; • The provision of 114 no. trailer parking spaces; • The provision of a Double Deck Drive Thru with canopy structure for level loading; • The provision of 82 no. car parking spaces (including 7 no. EV parking spaces and 5 no. accessible parking spaces), 4 no. motorbike parking spaces and 56 no. secure bicycle parking spaces; • 3 no. new vehicular access / egress points are proposed in the form of 2 no. HGV access / egress points via Rowan Tree Road and 1 no. vehicular access point to the serve staff car parking areas separately via Rowan Tree Road; • 1 no. bin store (approx. 32 sqm) and 1 no. recycling store (approx. 18 sqm) (approx. 50 sqm total GFA); • 1 no. ESB Substation located along Rowan Tree Road; • 1 no. Sprinkler Tank and 1 no. Pump House associated with the proposed warehousing unit; • 1 no. LPG Tank; • An attenuation basin located at the north-western boundary of the site; • Extension of pedestrian and cycling facilities along Rowan Tree Road previously permitted under Reg. Ref. 23516; • 3 no. signage areas on the north-eastern, south-western and south-eastern elevations of the proposed unit (approx. 2.135m x 7.240m each) • PV solar panels at roof level; • Security Fencing (approx. 2.4m in height) surrounding the Service Yard on the south-western boundary, and north-western boundary and to include new security fence & sliding gates to the 2no HGV access / egress points on the south-eastern elevation. • All associated site development works including lighting, external plant, landscaping and engineering works.

What happens next

Permission was granted on 28 Apr 2026. Third parties may appeal within four weeks; after that the permission is final and works can start once a commencement notice is lodged.

For the applicant

Is this your application?

Sign in to follow it through the Kildare planning process, get told when the decision lands, and see which builders and trades are working on similar projects near you. It is free and takes an email address.

Follow this applicationNo cold calls. Nothing is shared unless you choose to.

Nearby applications

Other applications on the Kildare register close to this address.

All Kildare planning applications

About this page: the facts above come from the statutory public planning register kept by Kildare County Council and are refreshed weekly (last updated 22 Jun 2026). Applicant names and contact details are not shown. Status labels are PlanningLeads' plain-language reading of the register status and the "Use" label is classified by AI from the public description (see how we use AI); neither is legal advice and the council's file is the record. How we handle this data: privacy notice.

Remove my application from this page

If this is your application and you would rather it did not appear here, tell us and we will take the page down. No account, no questions asked. This is your right to object under GDPR Article 21.