Planning application · Clare County Council

Works to the existing facility at Building 2, East Park

Building 2 East Park Shannon Industrial Estate, Shannon, Co. Clare

2460554 · ClareGranted

up to 2 storeys · 4.085 ha · Granted · permission to Jun 2030

Planning application 2460554 to Clare County Council: Works to the existing facility at Building 2, East Park, Shannon Industrial Estate, Shannon. Granted by the council on 26 May 2025. The register gives the permission's end as 30 June 2030.

Timeline

  1. Application lodged
  2. Further information requested
  3. Further information received
  4. Council granted
  5. Permission ends (date on the register)

The end date is the one the council register states. An extension or a commencement changes it.

Key facts

Reference
2460554
Planning authority
Clare County Council
Received
8 Nov 2024
Decided
26 May 2025
Status
Granted
Use
Industrial
Floor area (estimated)
4,340 m²
Read from the description, not stated on the register.
Site area
4.085 ha
Further information requested
17 Dec 2024
Further information received
22 Apr 2025

Proposed development

for works to the existing facility at Building 2, East Park, Shannon Industrial Estate, Shannon, Co. Clare. The proposed development consists of: -A two-storey manufacturing expansion 13m high with a footprint of 2168.125 m2 and an overall floor area of 4340 m2 over two floors located to the North and adjoining the existing facility. - The facility shall be clad in micro-rib external cladding to match existing and contain a single loading dock arrangement on its western elevation. - A single storey electrical room measuring 12m x 5m x 3m high constructed from block cavity construction and completed with a built up concrete flat roof shall be located on the eastern side and adjoining the new development. - A single storey metal clad steel structure to house new equipment measuring 12m x 7m x4m high and located on the northern elevation of the existing building adjoining the new development. - A new perimeter roadway extending into the existing northern fallow area. - All associated site works and temporary works

Planning status

Permission was granted on 26 May 2025. The four-week appeal period has passed with no appeal recorded, so the permission is final. Works can start once a commencement notice is lodged; the register gives its end as 30 Jun 2030.

For the applicant

Is this your application?

Say it is yours and you will see which building firms and trades have asked to work on it, with the contact details they chose to leave. It is free and takes an email address. Nothing is shared with anyone unless you choose to contact them.

Sign in to claim itNo cold calls. Nothing is shared unless you choose to.
Free tool · no account needed

Buying or upgrading a home? Get a free solar, SEAI grant and deep-retrofit report.

Enter an address to see its solar potential, the full SEAI grant it qualifies for, and the BER-uplift economics of a deep retrofit - in one report, in minutes.

Nearby applications

Other applications on the Clare register close to this address.

All Clare planning applications

Related

About this page: the facts above come from the statutory public planning register kept by Clare County Council and are refreshed weekly (last updated 28 Sept 2026). Applicant names and contact details are not shown. Status labels are PlanningLeads' plain-language reading of the register status and the "Use" label is classified by AI from the public description (see how we use AI); neither is legal advice and the council's file is the record. How we handle this data: privacy notice.

Remove my application from this page

If this is your application and you would rather it did not appear here, tell us and we will take the page down. No account, no questions asked: we only email you a link to confirm it was you. This is your right to object under GDPR Article 21.