Proposed development of a soil recovery facility
County
Wicklow
Planning authority
Wicklow County Council
Case type
SID (Not incl LAP SID cases)
Lodged
January 2026
Official record: An Coimisiún Pleanála case 324033
Full project detail is a Max feature
Unlock the developer/applicant, the connection voltage, exact location, decision & status and environmental flags - plus directory filtering, the map and API/export.
Need the whole pipeline in your own GIS? Enterprise feed licence
Other strategic infrastructure projects
- Ballinclare Quarry, Proposed Material Recovery / Recycling Facility and Inert LandfillWicklow
- Proposed development of a 110 kV substation with Gas Insulated Switchgear (GIS) technology and two 110 kV underground transmission cables (connecting to existing 220 kV overhead lines to the northwest of the proposed substation) along with associated and ancillary works.Wicklow
- Development of a 110kV substation and associated compound and ancillary equipment to facilitate the connection of Ballinclea Lower Solar Farm to the electricity transmission network.Wicklow
- Proposed development will comprise of onshore grid infrastructure including 220kV export cable circuits and fibre optic cables, new 220kV GIS substation at Shelton Abbey and overhead line connection and all associated ancillary works.Wicklow
- Development and operation of an inert landfill facility to backfill the existing quarry to original ground level; progressive restoration of the backfilled quarry to long-term grassland / scrub habitat; establishment and operation of a construction and demolition waste recovery facility; installation and operation of a soil washing plant and all associated site works.Wicklow
- Proposed development of a two storey 110kV GIS substation with all associated site works and ancillary worksWicklow