retrofit_energyGrid & Substations

Proposed development of a 110 kV substation with Gas Insulated Switchgear (GIS) technology and two 110 kV underground transmission cables (connecting to existing 220 kV overhead lines to the northwest of the proposed substation) along with associated and ancillary works.

County
Wicklow
Case type
SID (Not incl LAP SID cases)

Full project detail is a Max feature

Unlock the developer/applicant, this project's capacity (MW), exact location, decision & status and environmental flags - plus directory filtering, the map and API/export.

A free account lets you browse the full directory; Max unlocks per-project detail.

Win work on projects this size.

PlanningLeads tracks strategic infrastructure alongside every planning application and commencement across all 31 local authorities - scored, sized and filtered to your trade.