retrofit_energyGrid & Substations
Proposed development of a 110 kV substation with Gas Insulated Switchgear (GIS) technology and two 110 kV underground transmission cables (connecting to existing 220 kV overhead lines to the northwest of the proposed substation) along with associated and ancillary works.
County
Wicklow
Planning authority
Wicklow County Council
Case type
SID (Not incl LAP SID cases)
Lodged
November 2022
Official record: An Coimisiún Pleanála case 315200
Full project detail is a Max feature
Unlock the developer/applicant, the connection voltage, exact location, decision & status and environmental flags - plus directory filtering, the map and API/export.
Need the whole pipeline in your own GIS? Enterprise feed licence
Other grid & substations projects
- Development of a 110kV substation and associated compound and ancillary equipment to facilitate the connection of Ballinclea Lower Solar Farm to the electricity transmission network.Wicklow
- Proposed development will comprise of onshore grid infrastructure including 220kV export cable circuits and fibre optic cables, new 220kV GIS substation at Shelton Abbey and overhead line connection and all associated ancillary works.Wicklow
- Proposed development of a two storey 110kV GIS substation with all associated site works and ancillary worksWicklow
- 10 year planning permission for a 110kV substation, underground grid connection and associated infrastructureClare
- Proposed 110 kV/ 38kV/Medium voltage (MV) electrical substation and all associated infrastructureMeath
- Proposed Development which consists of a 110kV onsite electrical substation, loop-in grid connection, and associated infrastructure and worksMayo