Solarsolar_farmGrid & Substations
Development of a 110kV substation and associated compound and ancillary equipment to facilitate the connection of Ballinclea Lower Solar Farm to the electricity transmission network.
County
Wicklow
Planning authority
Wicklow County Council
Case type
SID (Not incl LAP SID cases)
Lodged
March 2022
Official record: An Coimisiún Pleanála case 312936
Full project detail is a Max feature
Unlock the developer/applicant, the connection voltage, exact location, decision & status and environmental flags - plus directory filtering, the map and API/export.
Need the whole pipeline in your own GIS? Enterprise feed licence
Other solar projects
- Proposed development of a 110 kV substation with Gas Insulated Switchgear (GIS) technology and two 110 kV underground transmission cables (connecting to existing 220 kV overhead lines to the northwest of the proposed substation) along with associated and ancillary works.Wicklow
- Proposed development will comprise of onshore grid infrastructure including 220kV export cable circuits and fibre optic cables, new 220kV GIS substation at Shelton Abbey and overhead line connection and all associated ancillary works.Wicklow
- Proposed development of a two storey 110kV GIS substation with all associated site works and ancillary worksWicklow
- Proposed development of a 220kV Loop In Loop Out (LILO) Gas Insulated Switchgear (GIS) substation, Battery Energy Storage System (BESS) and associated grid connection infrastructureLimerick
- Proposed development of a 220kV Air Insulated Substation (AIS) and Loop-in Grid Connection at Greenhills Solar FarmCork
- Proposed 110 kV Substation at a site fronting onto Steeven?s Lane, Dublin 8Dublin