Grid & Substations
10 year planning permission for a 220kV AIS/ 220kV GIS substation OR a 110kV electricity substation, associated 220kV or 110kV underground grid connection and ancillary works
County
Carlow
Planning authority
Carlow County Council
Case type
SID (Not incl LAP SID cases)
Lodged
November 2025
Official record: An Coimisiún Pleanála case 323860
Full project detail is a Max feature
Unlock the developer/applicant, the connection voltage, exact location, decision & status and environmental flags - plus directory filtering, the map and API/export.
Need the whole pipeline in your own GIS? Enterprise feed licence
Other grid & substations projects
- Proposed 110kV electrical substation and grid connectionCarlow
- Proposed Development of 110kV Electricity Substation and Approximately 8.8km of underground Electricity LineCarlow
- Proposed 110kV substation and underground grid connectionCarlow
- Proposed development of a 220kV Loop In Loop Out (LILO) Gas Insulated Switchgear (GIS) substation, Battery Energy Storage System (BESS) and associated grid connection infrastructureLimerick
- Proposed development of a 220kV Air Insulated Substation (AIS) and Loop-in Grid Connection at Greenhills Solar FarmCork
- Proposed 110 kV Substation at a site fronting onto Steeven?s Lane, Dublin 8Dublin