Grid & Substations
Proposed 110kV substation and underground grid connection
County
Carlow
Planning authority
Carlow County Council
Case type
SID (Not incl LAP SID cases)
Lodged
March 2022
Official record: An Coimisiún Pleanála case 313139
Full project detail is a Max feature
Unlock the developer/applicant, the connection voltage, exact location, decision & status and environmental flags - plus directory filtering, the map and API/export.
Need the whole pipeline in your own GIS? Enterprise feed licence
Other grid & substations projects
- 10 year planning permission for a 220kV AIS/ 220kV GIS substation OR a 110kV electricity substation, associated 220kV or 110kV underground grid connection and ancillary worksCarlow
- Proposed 110kV electrical substation and grid connectionCarlow
- Proposed Development of 110kV Electricity Substation and Approximately 8.8km of underground Electricity LineCarlow
- Proposed development of a 220kV Loop In Loop Out (LILO) Gas Insulated Switchgear (GIS) substation, Battery Energy Storage System (BESS) and associated grid connection infrastructureLimerick
- Proposed development of a 220kV Air Insulated Substation (AIS) and Loop-in Grid Connection at Greenhills Solar FarmCork
- Proposed 110 kV Substation at a site fronting onto Steeven?s Lane, Dublin 8Dublin