Grid & Substations
Construction of a 110 kV substation facility, electrical connection to the national grid and associated works and services
County
Roscommon
Planning authority
Roscommon County Council
Case type
SID (Not incl LAP SID cases)
Lodged
March 2025
Official record: An Coimisiún Pleanála case 322045
Full project detail is a Max feature
Unlock the developer/applicant, the connection voltage, exact location, decision & status and environmental flags - plus directory filtering, the map and API/export.
Need the whole pipeline in your own GIS? Enterprise feed licence
Other grid & substations projects
- 110kV Electricity Substation, approximately 7.5km of Underground Electricity Line & All Associated Works.Roscommon
- 110kV single-bay air insulated substation (Cuilleen), 110kV underground grid connection and all associated works.Roscommon
- Proposed development of a 220kV Loop In Loop Out (LILO) Gas Insulated Switchgear (GIS) substation, Battery Energy Storage System (BESS) and associated grid connection infrastructureLimerick
- Proposed development of a 220kV Air Insulated Substation (AIS) and Loop-in Grid Connection at Greenhills Solar FarmCork
- Proposed 110 kV Substation at a site fronting onto Steeven?s Lane, Dublin 8Dublin
- The proposed development consists of the decommissioning of 23 no. turbines and the erection of 17 no. wind turbines, underground electrical (33kV) and communications cabling connecting the wind turbines to a new on-site 110kV electrical substation and all associated infrastructure and worksSligo