110kV Substation and Underground Grid Connection
County
Laois
Planning authority
Laois County Council
Case type
SID (Not incl LAP SID cases)
Lodged
October 2024
Official record: An Coimisiún Pleanála case 321064
Full project detail is a Max feature
Unlock the developer/applicant, the connection voltage, exact location, decision & status and environmental flags - plus directory filtering, the map and API/export.
Need the whole pipeline in your own GIS? Enterprise feed licence
Other grid & substations projects
- A 110kv 'loop in/loop-out' Air-Insulated Switchgear substation, electricity lines, on-site access tracks and all associated site development worksLaois
- 10 year planning permission for a 110kV substation, underground grid connection and associated infrastructureClare
- Proposed 110 kV/ 38kV/Medium voltage (MV) electrical substation and all associated infrastructureMeath
- Proposed Development which consists of a 110kV onsite electrical substation, loop-in grid connection, and associated infrastructure and worksMayo
- Proposed 220kV Independent Power Producer (IPP) GIS substation, High Voltage Lines, Electric Plant and associated Site Development WorksWestmeath
- The proposed development consists of 13 wind turbines, a 110kV substation, battery energy storage system (BESS) and all associated infrastructureMayo