Grid & Substations
Proposed development of 2 no. 110kV electrical substations with customer and Eirgrid compounds and 110kV grid connections.
County
Louth
Planning authority
Louth County Council
Case type
SID (Not incl LAP SID cases)
Lodged
August 2023
Official record: An Coimisiún Pleanála case 317925
Full project detail is a Max feature
Unlock the developer/applicant, the connection voltage, exact location, decision & status and environmental flags - plus directory filtering, the map and API/export.
Need the whole pipeline in your own GIS? Enterprise feed licence
Other grid & substations projects
- Proposed 220kV substation, associated 220kV underground grid connection, cabling and associated works.Louth
- Proposed development of a 220kV Loop In Loop Out (LILO) Gas Insulated Switchgear (GIS) substation, Battery Energy Storage System (BESS) and associated grid connection infrastructureLimerick
- Proposed development of a 220kV Air Insulated Substation (AIS) and Loop-in Grid Connection at Greenhills Solar FarmCork
- Proposed 110 kV Substation at a site fronting onto Steeven?s Lane, Dublin 8Dublin
- The proposed development consists of the decommissioning of 23 no. turbines and the erection of 17 no. wind turbines, underground electrical (33kV) and communications cabling connecting the wind turbines to a new on-site 110kV electrical substation and all associated infrastructure and worksSligo
- 10 year planning permission for a 110kV substation, underground grid connection and associated infrastructureClare