Open Cycle Gas turbine power plant (350MW) and associated infrastructure
County
Galway
Planning authority
Galway County Council
Case type
SID (Not incl LAP SID cases)
Lodged
August 2023
Official record: An Coimisiún Pleanála case 317810
Full project detail is a Max feature
Unlock the developer/applicant, the connection voltage, exact location, decision & status and environmental flags - plus directory filtering, the map and API/export.
Need the whole pipeline in your own GIS? Enterprise feed licence
Other strategic infrastructure projects
- Planning permission for a 220kV Substation and 220kV underground electricity cabling connecting to the existing Cashla 220kV substationGalway
- 10 year planning permission for 110kV air insulated substation and associated grid connection infrastructureGalway
- Construction of an open-cycle gas turbine power plant, primarily fueled by Natural Gas, Above Ground Installation and ancillary developmentGalway
- Construction of wind energy development and all associated worksGalway
- 11 no. turbine wind farm and associated infrastructureGalway
- Proposed 400kV Gas insulated SwitchGear electricity substation and high voltage transmission lines/cables and electric plant.Galway