Construction of an open-cycle gas turbine power plant, primarily fueled by Natural Gas, Above Ground Installation and ancillary development
County
Galway
Planning authority
Galway County Council
Case type
SID (Not incl LAP SID cases)
Lodged
February 2026
Official record: An Coimisiún Pleanála case 324113
Full project detail is a Max feature
Unlock the developer/applicant, the connection voltage, exact location, decision & status and environmental flags - plus directory filtering, the map and API/export.
Need the whole pipeline in your own GIS? Enterprise feed licence
Other strategic infrastructure projects
- Planning permission for a 220kV Substation and 220kV underground electricity cabling connecting to the existing Cashla 220kV substationGalway
- 10 year planning permission for 110kV air insulated substation and associated grid connection infrastructureGalway
- Construction of wind energy development and all associated worksGalway
- 11 no. turbine wind farm and associated infrastructureGalway
- Proposed 400kV Gas insulated SwitchGear electricity substation and high voltage transmission lines/cables and electric plant.Galway
- Reserve Gas-Fire Power GeneratorGalway