retrofit_energyGrid & Substations
Proposed 400kV Gas insulated SwitchGear electricity substation and high voltage transmission lines/cables and electric plant.
County
Galway
Planning authority
Galway County Council
Case type
SID (Not incl LAP SID cases)
Lodged
July 2024
Official record: An Coimisiún Pleanála case 320094
Full project detail is a Max feature
Unlock the developer/applicant, the connection voltage, exact location, decision & status and environmental flags - plus directory filtering, the map and API/export.
Need the whole pipeline in your own GIS? Enterprise feed licence
Other grid & substations projects
- Planning permission for a 220kV Substation and 220kV underground electricity cabling connecting to the existing Cashla 220kV substationGalway
- 10 year planning permission for 110kV air insulated substation and associated grid connection infrastructureGalway
- Substation comprising of 220kV Gas Insulated Switchgear Building, Independant Power Producer Compound, Battery Energy Storage System Compound, Undergorund Grid Connection and Associated Cabling.Galway
- Electrical Substation, 110kV and 33kV compound, underground cable (110kV) installations with associated electrical plant, equipment, control buildings and all associated worksGalway
- Construction of up to 25 number wind turbines, one permanent meteorological mast, one 110kV substation and all associated site development works.Galway
- Power Supply Development comprising construction of a 220kv substation and associated works all located in the townlands of Palmerstown, Toberroe, Rathmorrisey, Caraunduff and Athenry,Galway