Grid & Substations
110kV loop-in/loop-out substation including substation compound, associated electrical plant and apparatus
County
Monaghan
Planning authority
Monaghan County Council
Case type
SID (Not incl LAP SID cases)
Lodged
January 2021
Official record: An Coimisiún Pleanála case 309119
Full project detail is a Max feature
Unlock the developer/applicant, the connection voltage, exact location, decision & status and environmental flags - plus directory filtering, the map and API/export.
Need the whole pipeline in your own GIS? Enterprise feed licence
Other grid & substations projects
- Proposed development of a 220kV Loop In Loop Out (LILO) Gas Insulated Switchgear (GIS) substation, Battery Energy Storage System (BESS) and associated grid connection infrastructureLimerick
- Proposed development of a 220kV Air Insulated Substation (AIS) and Loop-in Grid Connection at Greenhills Solar FarmCork
- Proposed 110 kV Substation at a site fronting onto Steeven?s Lane, Dublin 8Dublin
- The proposed development consists of the decommissioning of 23 no. turbines and the erection of 17 no. wind turbines, underground electrical (33kV) and communications cabling connecting the wind turbines to a new on-site 110kV electrical substation and all associated infrastructure and worksSligo
- 10 year planning permission for a 110kV substation, underground grid connection and associated infrastructureClare
- Proposed 110 kV/ 38kV/Medium voltage (MV) electrical substation and all associated infrastructureMeath