Planning application · Fingal County Council

Revisions to previously approved Gas Turbine Power Generation Station at Kilshane Road, Kilshane

Kilshane Road, Kilshane, Finglas, Dublin 11

FW25A/0523E · FingalGranted

13.56 ha · Granted · permission to Apr 2031 (estimate)

Planning application FW25A/0523E to Fingal County Council: Revisions to previously approved Gas Turbine Power Generation Station comprising: 1, at Kilshane Road, Kilshane, Finglas. Granted by the council on 23 April 2026. The permission normally runs to April 2031 (an estimate: the grant plus five years).

This application amends FW22A/0204, which carries the original file.

Timeline

  1. Application lodged
  2. Further information requested
  3. Further information received
  4. Council granted
  5. Permission normally ends (estimate)

The end date is an estimate: the grant plus five years, the normal life of a permission. An extension or a commencement changes it.

Key facts

Reference
FW25A/0523E
Planning authority
Fingal County Council
Received
4 Dec 2025
Decided
23 Apr 2026
Status
Granted
Application type
Industrial
Use
Industrial
Floor area (estimated)
1,283 m²
Read from the description, not stated on the register.
Site area
13.56 ha
Further information requested
24 Mar 2026
Further information received
30 Mar 2026

Proposed development

Kilshane Energy Ltd. intends to apply for planning permission for revisions to previously approved Gas Turbine Power Generation Station (Reg. Ref: FW22A/0204) comprising: 1. Revisions to previously approved administrative/warehouse building consisting of revised internal layout with addition of new stair core and lift at ground floor level connecting to new storage area at first floor level (428 m2 GFA), increasing the total GFA from 855 m2 to 1283 m2, revised façade design to elevations, increase in height by 1 m to 7.38 m, and revised colour of material finish from green to dark grey. 2. Revisions to previously approved gas turbine including revised shape of evaporative cooler, addition of servicing gantries and slight moving of the gas turbine c. 5.57 m to the north.

Planning status

Permission was granted on 23 Apr 2026. The four-week appeal period has passed with no appeal recorded, so the permission is final. Works can start once a commencement notice is lodged; the permission normally runs to Apr 2031 (estimate).

For the applicant

Is this your application?

Say it is yours and you will see which building firms and trades have asked to work on it, with the contact details they chose to leave. It is free and takes an email address. Nothing is shared with anyone unless you choose to contact them.

Sign in to claim itNo cold calls. Nothing is shared unless you choose to.
Free tool · no account needed

Buying or upgrading a home? Get a free solar, SEAI grant and deep-retrofit report.

Enter an address to see its solar potential, the full SEAI grant it qualifies for, and the BER-uplift economics of a deep retrofit - in one report, in minutes.

Nearby applications

Other applications on the Fingal register close to this address.

All Fingal planning applications

Related

About this page: the facts above come from the statutory public planning register kept by Fingal County Council and are refreshed weekly (last updated 5 Oct 2026). Applicant names and contact details are not shown. Status labels are PlanningLeads' plain-language reading of the register status and the "Use" label is classified by AI from the public description (see how we use AI); neither is legal advice and the council's file is the record. How we handle this data: privacy notice.

Remove my application from this page

If this is your application and you would rather it did not appear here, tell us and we will take the page down. No account, no questions asked: we only email you a link to confirm it was you. This is your right to object under GDPR Article 21.