Planning application · Dublin City Council

PROTECTED STRUCTURE: General conservation, refurbishment…

81-83 North Circular Road, Dublin 7, D07 C6W7

WEB2391/24 · DublinGranted
Reference
WEB2391/24
Planning authority
Dublin City Council
Received
28 Oct 2024
Decided
20 Feb 2025
Status
Granted
Site area
0.055 ha
Further information requested
18 Dec 2024
Further information received
27 Jan 2025

Proposed development

PROTECTED STRUCTURE: General conservation, refurbishment, alterations and fire safety upgrade works to include the following: (a) Conservation works will include: Repair and re-pointing of brickwork to front elevation of numbers 81 and 83; Reinstatement of timber sliding sash windows to original openings to front, Repair and restoration of original internal features, re-establishment of historic rooms to the Upper Ground Floors where previously subdivided; general conservation works. (b) Fire safety upgrade works to include fire compartmentation, protected stairways, corridors and lobbies; provision of an automatic opening vent (AOV) to the rear roof of Number 81; installation of emergency lighting and fire detection alarm systems. (c) Refurbishment works to include: Provision of a universal accessible bedroom with en-suite bathroom at Lower Ground Floor to Number 83; general internal layout changes including the removal of non-original internal walls to facilitate new, simplified internal layouts; New external double doors from Lower Ground Floor Dining to Number 81 and general layout alterations. (d) Demolition of the existing two-storey rear-return and single storey shed to Number 81 and construction of a new 2-storey and single storey rear return to accommodate a new kitchen, laundry, WCs and showers. (e) General external alterations include: Repairs to roof coverings and rainwater goods; the removal of covered veranda and widening of external interconnecting passage to rear Lower Ground Floor; Removal of 2 no. external steel stairs to back of No. 81 and No. 83; Removal of the existing ramp to the rear and its replacement with a new ramped access to the upper yard. (f) Upgrading of the electrical and mechanical services installations, surface water and foul drainage installations. (g) All associated internal and external works.

What happens next

Permission was granted on 20 Feb 2025. Third parties may appeal within four weeks; after that the permission is final and works can start once a commencement notice is lodged.

For the applicant

Is this your application?

Say it is yours and you will see which building firms and trades have asked to work on it, with the contact details they chose to leave. It is free and takes an email address. Nothing is shared with anyone unless you choose to contact them.

Sign in to claim itNo cold calls. Nothing is shared unless you choose to.

Nearby applications

Other applications on the Dublin register close to this address.

All Dublin planning applications

About this page: the facts above come from the statutory public planning register kept by Dublin City Council and are refreshed weekly (last updated 2 Sept 2026). Applicant names and contact details are not shown. Status labels are PlanningLeads' plain-language reading of the register status and the "Use" label is classified by AI from the public description (see how we use AI); neither is legal advice and the council's file is the record. How we handle this data: privacy notice.

Remove my application from this page

If this is your application and you would rather it did not appear here, tell us and we will take the page down. No account, no questions asked. This is your right to object under GDPR Article 21.