Planning application · Dublin City Council

PROTECTED STRUCTURE We, the Commissioners of Public Works…

at Chapelizod Road (R109), Chapelizod, Dublin 8, and Irish National War Memorial Gardens (INWMG)

3275/24 · DublinGranted
Reference
3275/24
Planning authority
Dublin City Council
Received
26 Feb 2024
Decided
10 Oct 2024
Status
Granted
Site area
0.36 ha
Further information requested
17 Apr 2024
Further information received
16 Sept 2024

Proposed development

PROTECTED STRUCTURE We, the Commissioners of Public Works, are applying for Planning Permission to the above named authority to construct a new accessible commemorative pedestrian and cycle bridge across the River Liffey which will also provide a new ceremonial entrance to the Irish National War Memorial Gardens (INWMG) at Chapelizod Road (R 109), Chapelizod, Dublin 8, Dublin. Under the Dublin City Development Plan 2022 - 2028, this site is included on the Record of Protected Structures, Ref. No. 2028 (Con Colbert Road, Dublin 8. Memorial Park, Islandbridge). The works will comprise of a lightweight arched stainless steel bridge to cross over the River Liffey with an uninterrupted span of 58 metres and a structural depth of approximately 0.35 metres. Works on both sides of the proposed stainless steel bridge to include: - a new ceremonial entrance plaza with stainless steel gates, granite wall and granite paved set-down area, with - a new permeable asphalt path connected to the bridge (northern end) and also running from the bridge (southern end) land on axis with the Temple (built 1993) in the INWMG. Areas of granite paving will drain to open jointed soak-away channels. The permeable asphalt paths do not require any additional drainage. All rainwater run-off will be retained on site to percolate into the ground. Enabling works and all ancillary site services be carried out as part of this proposed development. Removal of 7 trees on the north side of the river to allow for a safe wayfinding to the bridge. Proposed wildflowers planting to the northern side and mown grass to the southern side to match the rest of the INWMG. A Natura Impact Statement has been prepared in respect of this planning application. This application relates to Objective SMTO27 on the land Development Plan 2022 - 2028 Sustainable Movement and Transport.

What happens next

Permission was granted on 10 Oct 2024. Third parties may appeal within four weeks; after that the permission is final and works can start once a commencement notice is lodged.

For the applicant

Is this your application?

Say it is yours and you will see which building firms and trades have asked to work on it, with the contact details they chose to leave. It is free and takes an email address. Nothing is shared with anyone unless you choose to contact them.

Sign in to claim itNo cold calls. Nothing is shared unless you choose to.

Nearby applications

Other applications on the Dublin register close to this address.

All Dublin planning applications

About this page: the facts above come from the statutory public planning register kept by Dublin City Council and are refreshed weekly (last updated 2 Sept 2026). Applicant names and contact details are not shown. Status labels are PlanningLeads' plain-language reading of the register status and the "Use" label is classified by AI from the public description (see how we use AI); neither is legal advice and the council's file is the record. How we handle this data: privacy notice.

Remove my application from this page

If this is your application and you would rather it did not appear here, tell us and we will take the page down. No account, no questions asked. This is your right to object under GDPR Article 21.