Construction of a 449.8msq purpose-built operational infrastructure facility at Kilmore, Brinny
Kilmore, Brinny, Innishannon, Co. Cork.
Planning application 26/2222 to Cork County Council: Construction of a 449.8msq purpose-built operational infrastructure facility, supporting essential civil engineering and utility services, at Kilmore, Brinny, Innishannon.
Timeline
- Application lodged
Key facts
Proposed development
Permission for the construction of a 449.8msq (including 77.1msq Mezzanine) purpose-built operational infrastructure facility, supporting essential civil engineering and utility services, including secure storage areas for plant, machinery, and other construction materials and tools required soley in connection with the applicant's civil engineering and utility contracting business, a revised vehicular entrance and gate, internal circulation areas, parking and operational hard standing, 10m x 7m external storage area, storing Clause 804 and pipe grit for emergency use, associated surface water drainage infrastructure, waste water treatment system to serve wc and all other ancillary site development works.
Planning status
Permission was granted. Third parties may appeal within four weeks; after that the permission is final and works can start once a commencement notice is lodged.
Is this your application?
Say it is yours and you will see which building firms and trades have asked to work on it, with the contact details they chose to leave. It is free and takes an email address. Nothing is shared with anyone unless you choose to contact them.
Nearby applications
Other applications on the Cork County register close to this address.
- 26/1969Brinny, Innishannon, Co.CorkGranted
Construction of 3690msq purpose-built operational infrastructure, supporting essential civil engineering and utility services…
- 24/6269Kilmore Brinny Co CorkGranted
Permission for retention and continued use of existing processing plant and related water management system, the existing concrete plant…
- 25/6238Brinny, Innishannon, Co. Cork.Granted
A) Demolish existing porch to the front (south-western) elevation of the existing dwelling house…
- 23/6470A site of c. 8.75 ha located at lands Brinny Innishannon Co.CorkGranted
Construction of a solar PV energy development comprising the installation of solar photovoltaic (PV) panels on ground mounted frames/support structures within…
- 26/0624Kilmore, Brinny, Co. CorkGranted
1. An extension to the existing sand & gravel pit with extraction area of c. 9.8 hectares worked on a phased basis. 2. Continued use of development granted…
- 26/0422Brinny, Innishannon, Co. CorkOn Site
Construct 20 no. electric vehicle charging bays within an existing private car park, including the installation of associated charging infrastructure…
Related
About this page: the facts above come from the statutory public planning register kept by Cork County Council and are refreshed weekly (last updated 28 Sept 2026). Applicant names and contact details are not shown. Status labels are PlanningLeads' plain-language reading of the register status and the "Use" label is classified by AI from the public description (see how we use AI); neither is legal advice and the council's file is the record. How we handle this data: privacy notice.
Remove my application from this page
If this is your application and you would rather it did not appear here, tell us and we will take the page down. No account, no questions asked: we only email you a link to confirm it was you. This is your right to object under GDPR Article 21.