Permission for retention and continued use of existing processing plant at Kilmore Brinny
Kilmore Brinny Co Cork
Granted · permission to Aug 2035 (estimate)
Planning application 24/6269 to Cork County Council: Permission for retention and continued use of existing processing plant and related water management system, the existing concrete plant, at Kilmore Brinny. Granted by the council on 26 August 2025. The permission normally runs to August 2035 (an estimate: the grant plus ten years, as a ten-year permission was sought).
Timeline
- Application lodged
- Council granted
- Permission normally ends (estimate)
The end date is an estimate: the grant plus ten years (a ten-year permission was sought). An extension or a commencement changes it.
Key facts
Homes and mix
- ESB substations
Read from the description, not stated on the register. Shown only where the parts add up to the total.
Proposed development
Permission for retention and continued use of existing processing plant and related water management system, the existing concrete plant, ancillary buildings (site office 63 sq.m), 3 no. welfare portacabins (32 sq.m, 23.5s q.m & 22.0 sq.m), 4 no. storage buildings/containers (15 sq.m, 10 sq.m, 6 sq.m & 5 sq.m), 2 no. garages (76 sq.m & 76 sq.m), ESB Substation (26 sq.m), covered vehicle storage (220 sq.m), site access and all related ancillary facilities (wheelwash, fuel storage tank, weighbridge etc), permitted under Pl.Reg.No. S/02/1023), all for a duration of 10 years. 2) Permission for proposed development comprising removal of existing disused fuel storage tanks, recycling of c.15,000 tonnes of concrete for use in concrete production, importation of 25,000 tonnes of sand & gravel for processing, importation of c. up to 20,000 tonnes of soil and stone per year (under Article 27) for phased site restoration with a revised phasing plan and completion of restoration of the overall site to agricultural use. Permission is sought for eight years plus two years final restoration, total of 10 years. All within an application area of c.21.4 hectares.
Planning status
Permission was granted on 26 Aug 2025. The four-week appeal period has passed with no appeal recorded, so the permission is final. Works can start once a commencement notice is lodged; the permission normally runs to Aug 2035 (estimate).
Is this your application?
Say it is yours and you will see which building firms and trades have asked to work on it, with the contact details they chose to leave. It is free and takes an email address. Nothing is shared with anyone unless you choose to contact them.
Nearby applications
Other applications on the Cork County register close to this address.
- 26/0624Kilmore, Brinny, Co. CorkGranted
1. An extension to the existing sand & gravel pit with extraction area of c. 9.8 hectares worked on a phased basis. 2. Continued use of development granted…
- 26/2222Kilmore, Brinny, Innishannon, Co. Cork.Granted
Construction of a 449.8msq (including 77.1msq Mezzanine) purpose-built operational infrastructure facility…
- 26/1969Brinny, Innishannon, Co.CorkGranted
Construction of 3690msq purpose-built operational infrastructure, supporting essential civil engineering and utility services…
- 25/6238Brinny, Innishannon, Co. Cork.Granted
A) Demolish existing porch to the front (south-western) elevation of the existing dwelling house…
Related
About this page: the facts above come from the statutory public planning register kept by Cork County Council and are refreshed weekly (last updated 21 Sept 2026). Applicant names and contact details are not shown. Status labels are PlanningLeads' plain-language reading of the register status and the "Use" label is classified by AI from the public description (see how we use AI); neither is legal advice and the council's file is the record. How we handle this data: privacy notice.