Strategic infrastructure
Marine & Coastal projects in Ireland
Projects of this type consented directly by An Coimisiun Pleanala, the national planning body, rather than by a local council. They never appear on a council planning register, which is why they are easy to miss. Each one links to its public case file.
8 projects tracked
Most schemes of this kind never take this route. Another 109 applications sit on the council registers, which we track as well. A free account opens them.
Dublin
- 15-year permission for development at Oil Berth 3 and Oil Berth 4, Eastern Oil Jetty and at Berths 50A, 50N, 50S, 51, 51A, 49, 52, 53 and associated terminal yards to provide for various elements including new Ro-Ro jetty and consolidation of passenger terminal buildings.304888
- Eight-year permission for the construction of a cruise berth facility comprising a new quay, berth and access causeway, dredging of a navigation channel and associated works, all atPA0042
Kerry
- 10 year permission for proposed Shannon Technology and Energy Park consisting of power plant, battery energy storage system, floating storage and regasification unit, jetty, onshore receiving facilities, above ground installation and all ancillary structures/works.322568
- 10 year permission for proposed Shannon Technology and Energy Park consisting of power plant, battery energy storage system, floating storage and regasification unit, jetty, onshore receiving facilities, above ground installation and all ancillary structures/works.311233
Other types
Data CentresWind EnergySolar FarmsBattery StorageGrid & SubstationsWater & WastewaterRoads & TransportRailDrainage & Flood
Capacity, decision dates and the applicant behind each project are on the full directory. Utilities and network teams can pull the whole set into QGIS or ArcGIS Pro as a GeoJSON layer.