Battery StorageMarine & Coastal
10 year permission for proposed Shannon Technology and Energy Park consisting of power plant, battery energy storage system, floating storage and regasification unit, jetty, onshore receiving facilities, above ground installation and all ancillary structures/works.
County
Kerry
Planning authority
Kerry County Council
Case type
SID (Not incl LAP SID cases)
Lodged
May 2025
Official record: An Coimisiún Pleanála case 322568
Full project detail is a Max feature
Unlock the developer/applicant, the connection voltage, exact location, decision & status and environmental flags - plus directory filtering, the map and API/export.
Need the whole pipeline in your own GIS? Enterprise feed licence
This project has another case
It was lodged with An Coimisiún Pleanála more than once, under the same name and site.
Other battery storage projects
- The proposed development will comprise of a 600MW Powerplant, 120MW Battery Energy Storage System, Above Ground Installation and associated ancillary works.Kerry
- The proposed development consists of 13 wind turbines, a 110kV substation, battery energy storage system (BESS) and all associated infrastructureMayo
- The proposed development consists of up to 16 no. wind turbines (Tirawley Wind Farm), including a 110kV sub-station on site, an energy storage system in the form of a battery array located within container units and all associated infrastructureMayo
- The proposed development will consist of a 10-year planning permission for the construction of 1 Battery Energy Storage System, 1 110kV AIS electrical substation building and 1 single-storey customer substation building and all associated infrastructureCork
- Proposed development of 220kV 'Loop in' Substation, Battery Energy Storage System, Overhead lines, and associated worksMeath
- Substation comprising of 220kV Gas Insulated Switchgear Building, Independant Power Producer Compound, Battery Energy Storage System Compound, Undergorund Grid Connection and Associated Cabling.Galway