Wind Energy
10-year permission for the proposed construction of the Ballincor Wind Farm and all associated infrastructure
County
Tipperary
Planning authority
Tipperary County Council
Case type
SID (Not incl LAP SID cases)
Lodged
April 2026
Official record: An Coimisiún Pleanála case 324220
Full project detail is a Max feature
Unlock the developer/applicant, the connection voltage, exact location, decision & status and environmental flags - plus directory filtering, the map and API/export.
Need the whole pipeline in your own GIS? Enterprise feed licence
Other wind energy projects
- The proposed Littleton Wind Farm comprising of 11 no. turbines and all associated worksTipperary
- 10 year planning permission for the proposed development of Ballincor Wind Farm and all associated infrastructureTipperary
- Proposed development of 10 Wind Turbines, 110kV Electrical Substation and ancillary developmentTipperary
- 10 year development of 9 Wind Turbines and associated infrastructureTipperary
- Proposed amendments to the previously authorised Upperchurch Windfarm (An Bord Plean?la case reference PL22.243040) to increase the size of the wind turbines and amend the height and design of the two meteorological mastsTipperary
- Development consisting of a new 110kV substation, underground 110kV cabling and ancillary works to connect the already consented Upperchurch Wind Farm substation to the existing 110kV overhead line.Tipperary