retrofit_energyBattery StorageGrid & Substations
Substation comprising of 220kV Gas Insulated Switchgear Building, Independant Power Producer Compound, Battery Energy Storage System Compound, Undergorund Grid Connection and Associated Cabling.
County
Galway
Planning authority
Galway County Council
Case type
SID (Not incl LAP SID cases)
Lodged
July 2024
Official record: An Coimisiún Pleanála case 320087
Full project detail is a Max feature
Unlock the developer/applicant, the connection voltage, exact location, decision & status and environmental flags - plus directory filtering, the map and API/export.
Need the whole pipeline in your own GIS? Enterprise feed licence
Other battery storage projects
- Planning permission for a 220kV Substation and 220kV underground electricity cabling connecting to the existing Cashla 220kV substationGalway
- 10 year planning permission for 110kV air insulated substation and associated grid connection infrastructureGalway
- Proposed 400kV Gas insulated SwitchGear electricity substation and high voltage transmission lines/cables and electric plant.Galway
- Electrical Substation, 110kV and 33kV compound, underground cable (110kV) installations with associated electrical plant, equipment, control buildings and all associated worksGalway
- Construction of up to 25 number wind turbines, one permanent meteorological mast, one 110kV substation and all associated site development works.Galway
- Power Supply Development comprising construction of a 220kv substation and associated works all located in the townlands of Palmerstown, Toberroe, Rathmorrisey, Caraunduff and Athenry,Galway