10 year planning permission for the proposed Open Cycle Gas Turbine (OCGT) power plant fuelled by Hydrotreated Vegetable Oil (HVO) and associated site works
County
Kerry
Planning authority
Kerry County Council
Case type
SID (Not incl LAP SID cases)
Lodged
November 2023
Official record: An Coimisiún Pleanála case 318540
Full project detail is a Max feature
Unlock the developer/applicant, the connection voltage, exact location, decision & status and environmental flags - plus directory filtering, the map and API/export.
Need the whole pipeline in your own GIS? Enterprise feed licence
Other strategic infrastructure projects
- 10 year permission for proposed Shannon Technology and Energy Park consisting of power plant, battery energy storage system, floating storage and regasification unit, jetty, onshore receiving facilities, above ground installation and all ancillary structures/works.Kerry
- 10 year planning permission for wind energy development consisting of 17 no. wind turbines and related worksKerry
- Proposed development of a Gas Insulated Switchgear (GIS) substation compoundKerry
- Proposed Windfarm repowering Application of the existing Kilgarvan Wind FarmKerry
- The proposed development will comprise of a 600MW Powerplant, 120MW Battery Energy Storage System, Above Ground Installation and associated ancillary works.Kerry
- Proposed development of 110kV substation and all associated infrastructure.Kerry