Grid & Substations
110kV substation with associated electrical plant, control buildings, welfare facilities, security fencing, additional internal access traces, 110kV overhead line grid connection to existing transmission line on site, which will consist of a 10 year permission.
County
Meath
Planning authority
Meath County Council
Case type
SID (Not incl LAP SID cases)
Lodged
April 2020
Official record: An Coimisiún Pleanála case 307136
Full project detail is a Max feature
Unlock the developer/applicant, the connection voltage, exact location, decision & status and environmental flags - plus directory filtering, the map and API/export.
Need the whole pipeline in your own GIS? Enterprise feed licence
Other grid & substations projects
- Proposed 110 kV/ 38kV/Medium voltage (MV) electrical substation and all associated infrastructureMeath
- Construction of 110kV substation and associated infrastructureMeath
- Proposed development of 110kV/MV distribution station.Meath
- Proposed development of 220kV 'Loop in' Substation, Battery Energy Storage System, Overhead lines, and associated worksMeath
- 110kV Substation and Loop-in connection associated with an approved Solar PV Development.Meath
- Proposed development of a 110kV Substation and associated works.Meath