Planning application · Waterford City and County Council

1. The demolition of 1152.9 sq.m temporary educational facility…

Gaelcholáiste Phort Láirge , Bishopscourt , Ballygunner Waterford

2560541 · WaterfordIn AssessmentAppealed
Reference
2560541
Planning authority
Waterford City and County Council
Received
1 Aug 2025
Decided
26 Feb 2026
Status
In Assessment
Site area
2.22 ha
Further information requested
24 Sept 2025
Further information received
30 Jan 2026

Proposed development

1. The demolition of 1152.9 sq.m temporary educational facility consisting of prefabricated single storey buildings, comprising of 14 classrooms, 1 staff room, administration offices, toilet blocks, vehicular and pedestrian access gates, signage, car park, footpath and astro turf pitch. 2. The demolition of 77sq.m of a temporary creche facility comprising of prefabricated single storey building with outdoor play area. 3. The construction of a new standalone 5,573sq.m post primary school. Accommodation provides for 2 classroom special education needs unit with all associated facilities, 12 general classrooms, 1 multimedia room, 1 music room, 1 textile room, 1 design room, I graphics room, 2 science laboratories with associated preparation room, 1 engineering room, 1 construction studies with associated preparation room, 1 art room with associated project store, 1 home economics room, 1 library, 1 general purpose hall, 1 staff room, 1 kitchenette, 3 SET Rooms, 7 administrative rooms, 1 multi use hall and associated PE store, 1 fitness suite, 2 changing rooms, ancillary accommodation and circulation. 4. Realignment of roadside boundary, reconfiguration of existing entrance egress, construction of a new pedestrian path, cycle path, new entrance access road, front boundary wall with signage, 2 No. gates, a public drop-off area and 1 no bus stop. 5. Construction of a new internal carriageway, car park with 48 no. car park spaces, parent drop off area, 70 no. cycle space, 4 No bus drop off, 2 No special education needs unit drop off and new signage above the main building entrance. 6. Construction of ESB substation, switch room, foul pump station, bio retention soakway, LPG area, bin store, external store, covered yard, heat pump compound, 3 ball courts, 1 Astro turf pitch, all associated ancillary site development, drainage, fencing and landscape works.

What happens next

The decision has been appealed to An Coimisiún Pleanála. The appeal outcome replaces the council decision.

For the applicant

Is this your application?

Sign in to follow it through the Waterford planning process, get told when the decision lands, and see which builders and trades are working on similar projects near you. It is free and takes an email address.

Follow this applicationNo cold calls. Nothing is shared unless you choose to.

Nearby applications

Other applications on the Waterford register close to this address.

All Waterford planning applications

About this page: the facts above come from the statutory public planning register kept by Waterford City and County Council and are refreshed weekly (last updated 3 Aug 2026). Applicant names and contact details are not shown. Status labels are PlanningLeads' plain-language reading of the register status and the "Use" label is classified by AI from the public description (see how we use AI); neither is legal advice and the council's file is the record. How we handle this data: privacy notice.

Remove my application from this page

If this is your application and you would rather it did not appear here, tell us and we will take the page down. No account, no questions asked. This is your right to object under GDPR Article 21.