A renewable energy development as defined by the European Union Regulations 2025 at Lisbrien, Nenagh
Lisbrien, Nenagh, Co. Tipperary
6.9 ha · Lodged
Planning application 2660902 to Tipperary County Council: A renewable energy development as defined by the European Union Regulations 2025, at Lisbrien, Nenagh. A council decision is due by 9 November 2026.
Timeline
- Application lodged
- Council decision due
Key facts
Proposed development
permission for development on lands in the townland of Lisbrien, Co. Tipperary (the Proposed Development) which comprises a renewable energy development as defined by the European Union (Planning and Development) (Renewable Energy) Regulations 2025. The application seeks a 10-year permission with an operational lifetime of 40 years. The Proposed Development, subject of this application, will consist of: The development and operation of a solar photovoltaic (PV) farm with a total site area of 6.9 hectares. The application comprises the following – i. Construction and operation of 22,500 sqm. of solar PV arrays on ground-mounted metal frames, with a maximum overall height of 4.7 metres. ii. Internal underground trenching, electrical cabling and ducting between the solar PV arrays and electrical invertor units. iii. 4 no. electrical invertor units. iv. Use and upgrading of 1 no. existing field access point for construction and operational access to the site.1 no. temporary laydown area. v. 2 no. control cabins. vi. 33kV connector cable network, joint bays and associated works. vii. Internal access track, drainage works, security fencing, CCTV, and all associated ancillary site development works. viii. The decommissioning of the solar farm and reinstatement of the site at the end of its operational life. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2026 shall apply.
Planning status
The application has been lodged and validated. The council has eight weeks to decide, unless it asks for further information. The council's decision is due by 9 Nov 2026.
Is this your application?
Say it is yours and you will see which building firms and trades have asked to work on it, with the contact details they chose to leave. It is free and takes an email address. Nothing is shared with anyone unless you choose to contact them.
Nearby applications
Other applications on the Tipperary register close to this address.
- 25206Lisbrien, Nenagh, Co. TipperaryClosed
19600111 a solar PV panel array consisting of up to 22,500m2 of solar panels on ground mounted steel frames, 2 no. electricity control cabins…
- 2660606Lisbrien, Lissenhall, Nenagh Co. TipperaryGranted
change of house design to that granted under planning ref: 2260722 including: a) Internal modifications and upgrades to the existing dwelling house (Protected…
Related
About this page: the facts above come from the statutory public planning register kept by Tipperary County Council and are refreshed weekly (last updated 5 Oct 2026). Applicant names and contact details are not shown. Status labels are PlanningLeads' plain-language reading of the register status and the "Use" label is classified by AI from the public description (see how we use AI); neither is legal advice and the council's file is the record. How we handle this data: privacy notice.
Remove my application from this page
If this is your application and you would rather it did not appear here, tell us and we will take the page down. No account, no questions asked: we only email you a link to confirm it was you. This is your right to object under GDPR Article 21.