a RED III development for a period of 10 years for the construction of a solar PV energy…
Within the townland of , Ballyboe , County Tipperary
Proposed development
a RED III development for a period of 10 years for the construction of a solar PV energy development (renewable energy development) with a total site area of 32.6 hectares. The development will consist of PV panels mounted on metal frames, inverter station, string inverters, new access tracks, underground cabling, perimeter fencing with CCTV cameras and access gates, electrical cabling and ducting, new on-site ESB 38kV substation building, 33kV control building, lighting masts, laydown areas, landscaping and all ancillary grid infrastructure and associated works. The grid route is c. 1.06km in length. The Application Site will be accessed from two new access points off the R706, one of which was previously consented under Planning Reference: 19600239. The Proposed Development will connect with and represents an extension to the adjacent solar farm permitted under Planning Reference 19600239 and 21403. Permission is also sought for minor amendments to Planning Reference 19600239 and 21403 which comprises of (1) Minor adjustments to the perimeter fencing (length decreasing by c.1km), (2) Minor adjustments to the red line boundary (decreasing by c.1km), (3) Increase operational lifetime from 30 years to 40 years. The proposed solar farm will connect to the national grid via the new 38kV substation and will have an operational lifetime of 40 years. A Natura Impact Statement (NIS) has been prepared in respect of this application. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply
What happens next
The council is assessing the application. Submissions from the public are taken in the first five weeks.
Is this your application?
Sign in to follow it through the Tipperary planning process, get told when the decision lands, and see which builders and trades are working on similar projects near you. It is free and takes an email address.
About this page: the facts above come from the statutory public planning register kept by Tipperary County Council and are refreshed weekly (last updated 22 Jun 2026). Applicant names and contact details are not shown. Status labels are PlanningLeads' plain-language reading of the register status and the "Use" label is classified by AI from the public description (see how we use AI); neither is legal advice and the council's file is the record. How we handle this data: privacy notice.
Remove my application from this page
If this is your application and you would rather it did not appear here, tell us and we will take the page down. No account, no questions asked. This is your right to object under GDPR Article 21.