a 10-year permission for the development which will consist of the phased extension…
Dew Valley Foods , Holycross Road Thurles , Co. Tipperary
Proposed development
a 10-year permission for the development which will consist of the phased extension of the existing food manufacturing facility comprising: 1) construction of an 11,267 m² extension to the existing food manufacturing facility, including: (a) cold storage areas; (b) two-storey office space, toilet block, and drivers’ area; (c) new processing, packing, intake/dispatch areas; (d) electrical plant, maintenance rooms, and external steel access staircases; (e) new gas tanks, transformer compound, and pipe bridge; 2) construction of an 1,500 m³ storage building for packaging and machinery; 3) extension of existing wastewater treatment plant (WWTP) buildings (primary: 107 m², secondary: 250 m²); 4) construction of an 110 m² waste collection building; 5) extension to the existing water treatment plant (WTP) building (70 m²); 6) expansion of the high temperature (HT) plant room (64 m²); 7) construction of 4 no. tanks; 8) installation of 3 no. bunded kerosene tanks (50,000 L each); 9) construction of a 16 m high boiler stack; 10) construction of new internal access roads (c. 8,825 m²); 11) creation of a 520 m² internal courtyard area; 12) construction of a 630 m² external storage compound; 13) construction of a 3,120 m³ stormwater attenuation pond and discharge line; 14) installation of a standby treated effluent discharge pipeline (1,490 m); 15) realignment and expansion of site boundary, including new boundary walls, fencing and planting; 16) provision of an additional 8 no. truck parking spaces; 17) relocation of the existing fuel tank and weighbridge; 18) expansion of the existing sprinkler pump house (24 m²); 19) conversion of 22 no. existing car spaces including 1 no. accessible space to 22 no. EV car spaces as required and provision of 30 no. bicycle parking spaces; 20) installation of new site lighting; 21) demolition of existing buildings and structures (total 1,840 m²); and 22) all ancillary site development works and services to facilitate the development including drainage, landscaping, temporary construction compound and utility connections. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) has been submitted to the planning authority with this application
What happens next
Permission was granted on 15 Dec 2025. Third parties may appeal within four weeks; after that the permission is final and works can start once a commencement notice is lodged.
Is this your application?
Sign in to follow it through the Tipperary planning process, get told when the decision lands, and see which builders and trades are working on similar projects near you. It is free and takes an email address.
About this page: the facts above come from the statutory public planning register kept by Tipperary County Council and are refreshed weekly (last updated 6 Jul 2026). Applicant names and contact details are not shown. Status labels are PlanningLeads' plain-language reading of the register status and the "Use" label is classified by AI from the public description (see how we use AI); neither is legal advice and the council's file is the record. How we handle this data: privacy notice.