Ground mounted solar PV panels with new fence enclosure and access gates
Nenagh North Nenagh South and Tyone, Abbeycourt Hotel Dublin Road, Nenagh
0.3 ha · Granted · permission to Jan 2030
Planning application 2460449 to Tipperary County Council: Ground mounted solar PV panels with new fence enclosure and access gates, a container battery storage installation, at Nenagh North Nenagh South and Tyone, Abbeycourt Hotel Dublin Road. Granted by the council on 4 December 2024. The register gives the permission's end as 6 January 2030.
Timeline
- Application lodged
- Further information requested
- Further information received
- Council granted
- Permission ends (date on the register)
The end date is the one the council register states. An extension or a commencement changes it.
Key facts
Proposed development
(1) ground mounted solar PV panels with new fence enclosure and access gates; (2) a container battery storage installation with 6 electric vehicle charge points, and associated site works
Planning status
Permission was granted on 4 Dec 2024. The four-week appeal period has passed with no appeal recorded, so the permission is final. Works can start once a commencement notice is lodged; the register gives its end as 6 Jan 2030.
Is this your application?
Say it is yours and you will see which building firms and trades have asked to work on it, with the contact details they chose to leave. It is free and takes an email address. Nothing is shared with anyone unless you choose to contact them.
Nearby applications
Other applications on the Tipperary register close to this address.
- 2460078Nenagh North and Tyone, Abbeycourt Hotel Dublin Road, NenaghClosed
1. Solar PV panels to the existing hotel roof 2. Two new wind turbines, not exceeding 21.2m height. 3. A Container battery storage installation with 6 electric…
- 2460075Nenagh North and Tyone, Abbeycourt Hotel Dublin Road, NenaghClosed
(1). Solar PV panels to the existing hotel roof (2). Two new wind turbines, not exceeding 21.2m height (3). A container battery storage installation with 6…
- 25218Castleway, Dublin Road, NenaghGranted
construction of 16 semi-detached, three-bedroom, 2-storey houses and 8 three-bedroom, two-storey terraced houses, 8 two-bedroom apartments over four storeys…
- 24267Castleway, Dublin Road, NenaghGranted
the construction of 16 semi-detached, three-bedroom, 2-storey houses and 8 three-bedroom, two-storey terraced houses…
- 2660126St. Joseph’s CBS Secondary School, Summerhill Nenagh, Co. TipperaryGranted
change of use from residential use (former CBS brothers residence and ancillary garage) to assembly & recreation use (educational…
- 2660219St. Josephs CBS Primary School, Summerhill Nenagh, Co. TipperaryGranted
an all-weather training pitch with 5 metre high precast concrete ball wall, perimeter fencing…
Related
About this page: the facts above come from the statutory public planning register kept by Tipperary County Council and are refreshed weekly (last updated 21 Sept 2026). Applicant names and contact details are not shown. Status labels are PlanningLeads' plain-language reading of the register status and the "Use" label is classified by AI from the public description (see how we use AI); neither is legal advice and the council's file is the record. How we handle this data: privacy notice.
Remove my application from this page
If this is your application and you would rather it did not appear here, tell us and we will take the page down. No account, no questions asked: we only email you a link to confirm it was you. This is your right to object under GDPR Article 21.