South Dublin County Council
Planning applications received 18 Aug 2025 to 24 Aug 2025
21 applications this week.
- On Site23 Elder Heath Green, Dublin 24, Ireland, D24ND1VConstruction of single storey granny flat to the side of existing 2 storey dwelling consisting of bedroom, WC and living area and all associated works.SD25B/0510WReceived 23 Aug 2025Decision due 20 Oct 2025
- GrantedWoodtown, Ballycullen, Dublin 16.502 no. residential units (108no. 1-bed, 170no. 2-bed, 162 no. 3-bed; 62 no. 4-bed) comprising 197no. 2 storey houses (terraced/semi-detached/detached) (19no…LRD25A/0003WReceived 22 Aug 2025Decision due 15 Oct 2025
- On SiteEast Carpark, The Square, Belgard Square East, Tallaght, Dublin 24, D24X030The temporary use (for the next 5 years 2025-2029 inclusive) of part of the eastern carpark lands for the erection of a temporary tent structure for use as…SD25A/0196WReceived 22 Aug 2025Decision due 16 Oct 2025
- GrantedUnit 14, Rosse Court Hall, Rosse Court Avenue, Lucan, Co. DublinPlanning permission from the permitted class 2 (Professional Services) use to use as a medical surgery (Class 8)SD25A/0197WReceived 22 Aug 2025Decision due 16 Oct 2025
- Granted13, Castlegrange Close, Clondalkin, Dublin 22, D22C89740sq.m single storey shed with flat roof in the rear garden of the existing dwelling. Retention permission for the widened vehicular driveway entrance…SD25B/0317WReceived 22 Aug 2025Decision due 18 Sept 2025
- Granted30, Kingswood View, Belgard Road, Cookstown, Dublin, D24 XFT9Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, new access stairs…SD25B/0507WReceived 22 Aug 2025Decision due 16 Oct 2025
- Closed14, Wainsfort Manor Drive, Terenure, Dublin 6W, D6W X298Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, new access stairs…SD25B/0508WReceived 22 Aug 2025Decision due 16 Oct 2025
- Granted32, Orchardstown Drive, Rathfarnham, Dublin, D14 A2F3New works, retention of completed works and other associated ancillary works…SD25B/0509WReceived 22 Aug 2025Decision due 16 Oct 2025
- GrantedM50 Business Park, Ballymount Avenue, Co. Dublin, D12YP1DThe retention of the change of use for the portion of site highlighted on the accompanying drawings into commercial use for the sale of motor vehicles.…SD25A/0194WReceived 21 Aug 2025Decision due 15 Oct 2025
- ClosedUNIT 06, Oldcourt Shopping Centre, Parklands Road, Ballycullen, Dublin 24, D24 F5CFChange of use from permitted office use to proposed childcare facility (c.169sq.m) within Unit 06 of the Oldcourt Shopping Centre,Parklands Road…SD25A/0195WReceived 21 Aug 2025Decision due 15 Oct 2025
- Granted44, Knockcullen Lawn, Knocklyon, Dublin 16, D16 ND86(i) demolition of existing rear extension and shed; (ii) construction of single storey flat roof extension to the rear of existing two storey dwelling…SD25B/0504WReceived 21 Aug 2025Decision due 15 Oct 2025
- Granted19, Idrone Drive, Dublin 16, D16X6F8(1) Demolition of single storey front porch and garage extension (2) For a new first floor extension over existing side garage and a new single storey porch…SD25B/0505Received 21 Aug 2025Decision due 15 Oct 2025
- Granted97, Whitecliff, Rathfarnham, Dublin, D16 R6F4New window, roof light and an extension to the front, and all ancillary works necessary to facilitate the development.SD25B/0506WReceived 21 Aug 2025Decision due 15 Oct 2025
- On SiteUnit 5-9 Unit 4, Turnpike Business Park, Dublin 22, D22 CD74Part (104 sq.m gross) of the first floor currently in light industrial use at Unit 5-9…SD25A/0125WReceived 19 Aug 2025Decision due 15 Sept 2025
- Granted26, Woodstown Meadow, Ballycullen, Dublin 16, D16 E704Attic conversion for storage with full raised gable to the side, rear dormer, and new gable window. Repositioning of first-floor side window. Change in roof…SD25B/0502WReceived 19 Aug 2025Decision due 13 Oct 2025
- Lodged100, Esker Lawns, Lucan, Co. Dublin, K78 E6N9Extension to a semi-detached dwelling. Development will consist of construction of attic conversion with a dormer window to rear, and associated site worksSD25B/0503WReceived 19 Aug 2025Decision due 13 Oct 2025
- Closed1, Oatfield Park, Clondalkin, Dublin 22Detached 2 storey houseED25/0076Received 18 Aug 2025Decision due 15 Sept 2025
- GrantedCloverhill Industrial Estate, Clondalkin, Dublin 22Several items further to the construction of the development as granted planning under South Dublin County Council Reg. Ref. SD24A/0015 for an extension…SD25A/0191WReceived 18 Aug 2025Decision due 13 Oct 2025
- On SiteEpernay, Bohernabreena Road, Dublin, D24 YY04Construction of a storage shed and workshop, and all ancillary works necessary to facilitate the development.SD25B/0499WReceived 18 Aug 2025Decision due 13 Oct 2025
- On Site5, Colthurst Close, Lucan, DublinConverting the attic space to non-habitable home use, to include a dormer in the rear roof…SD25B/0500Received 18 Aug 2025Decision due 13 Oct 2025
- Granted1, wheatfield Road, Palmerstown, Dublin 20, D20KD53Two storey and single storey extension to sideSD25B/0501WReceived 18 Aug 2025Decision due 13 Oct 2025