Planning application · South Dublin County Council

Construction of a two storey stand-alone café/restaurant unit

Apex Hub, Calmount Road and Ballymount Avenue, Ballymount Industrial Estate, Dublin 12

SD25A/0268W · South DublinOn Site

up to 2 storeys · 0.386 ha · On Site

Planning application SD25A/0268W to South Dublin County Council: Construction of a two storey stand-alone café/restaurant unit, with an overall height of c. 8m and a gross floor area of 441 sq.m, at Apex Hub, Calmount Road and Ballymount Avenue, Ballymount Industrial. Granted by the council on 17 December 2025. Work commenced on 12 May 2026.

Timeline

  1. Application lodged
  2. Council granted
  3. Work commenced

Key facts

Reference
SD25A/0268W
Planning authority
South Dublin County Council
Received
4 Nov 2025
Decided
17 Dec 2025
Status
On Site
Use
Hospitality
Floor area
441 m²
Site area
0.386 ha
Commenced
12 May 2026

Homes and mix

  • 19 car parking spaces
  • 10 cycle parking spaces

Read from the description, not stated on the register. Shown only where the parts add up to the total.

Proposed development

The construction of a two storey stand-alone café/restaurant unit, with an overall height of c. 8m and a gross floor area of 441 sq.m, and associated ancillary drive thru lane, located to south of the permitted Apex Hub at Ballymount Industrial Estate (permitted under Reg. Ref.: SD22A/0099 as amended); The ancillary drive-thru lane, includes a canopy and service hatch on the northwestern elevation side of the unit, a height restrictor / entrance barrier on the access lane and a 3.5m wide drive-thru lane; The proposal includes associated drive-thru signage consisting of 1 no. directional sign, 1 no. order station, and 2 no. menu boards/advertisement signs and tenant signage on the southeastern, northeastern and northwestern elevations; The development includes associated soft and hard landscaping, associated outdoor seating area and external bin store for the proposed café/restaurant unit; The development includes a total of 19 no. car parking spaces including 4 no. EV spaces, 2 no. accessible spaces and 3 no. Staff parking spaces, waiting area, bin store and 10 no. cycle parking spaces; The development includes the repositioning of 2 no. permitted pedestrian crossing to the east of the site (permitted under Reg. Ref.: SD22A/0099); and All associated development. The proposed café/restaurant, with associated ancillary drive-thru lane, supersedes the permitted café unit on the subject site under Reg. Ref.: SD22A/0099.

Planning status

A commencement notice has been lodged: works are under way or about to start.

For the applicant

Is this your application?

Say it is yours and you will see which building firms and trades have asked to work on it, with the contact details they chose to leave. It is free and takes an email address. Nothing is shared with anyone unless you choose to contact them.

Sign in to claim itNo cold calls. Nothing is shared unless you choose to.
Free tool · no account needed

Buying or upgrading a home? Get a free solar, SEAI grant and deep-retrofit report.

Enter an address to see its solar potential, the full SEAI grant it qualifies for, and the BER-uplift economics of a deep retrofit - in one report, in minutes.

Nearby applications

Other applications on the South Dublin register close to this address.

All South Dublin planning applications

Related

About this page: the facts above come from the statutory public planning register kept by South Dublin County Council and are refreshed weekly (last updated 21 Sept 2026). Applicant names and contact details are not shown. Status labels are PlanningLeads' plain-language reading of the register status and the "Use" label is classified by AI from the public description (see how we use AI); neither is legal advice and the council's file is the record. How we handle this data: privacy notice.

Remove my application from this page

If this is your application and you would rather it did not appear here, tell us and we will take the page down. No account, no questions asked: we only email you a link to confirm it was you. This is your right to object under GDPR Article 21.