Development consisting of: a) Conservation and protection of all existing woodland areas…
Yew Point Hodson Bay , townlands of Barrymore Kiltoom Athlone , Co. Roscommon
Proposed development
Permission for development consisting of: a) Conservation and protection of all existing woodland areas and the natural environment as a fundamental objective of the development, b) Regeneration of the former woodland areas towards the centre of the Yew Point peninsula, now largely depleted following generations of agricultural activity, with the extensive planting of native tree species of Irish provenance, c) Construction of 36 no. timber eco-cabins providing 12 no. family cabins and 24 no. two-person cabins raised on stilts above ground levels, to conserve existing ground conditions and preserve through routes for movement of wildlife. The cabins arranged in five clusters confined to the southern portion of the lands, carefully respond to their specific site context, respecting existing woodlands and topographical conditions, d) Provision of 4 no. timber guest shelters distributed across the site, and a covered shelter to facilitate the charging and storing of electric golf buggies, e) Extension and refurbishment of the existing building/shop, with minor internal reconfigurations and the upgrading of the exterior with slatted timber screens, new doors and windows and a covered deck area, f) Construction of an Environmental Induction Area to facilitate the immersion of guests in environmental topics and the principles of fully sustainable living, and inform them, specifically, on the ecology and biodiversity of the Yew Point/Lough Ree area, g) All cabins and other new structures are designed to minimise environmental impact and disruption through the off-site fabrication of the main components, careful siting and reversible forms of construction. Materials of low embedded carbon are to be used and operational carbon is minimised through the use of renewable sources of energy. Surface water run-off is dealt with by strategically located Rain Gardens to filter and slowly release rainwater into the ground, h) Sustainable energy sources with the use of renewable solar photovoltaic panels as the primary source of energy generation for the entire development, i) Provision of slatted timber entrance gate structure to provide vehicular access and a covered pedestrian entrance with related signage, j) Construction of 1 no. reinforced "Grass-crete" surfaced car park at the existing site entrance providing 48 no. car parking spaces in total (1 no. car parking space per cabin and 12 no. staff car parking spaces). The car parking provision includes 10 no. EV charg
What happens next
A commencement notice has been lodged: works are under way or about to start.
Is this your application?
Sign in to follow it through the Roscommon planning process, get told when the decision lands, and see which builders and trades are working on similar projects near you. It is free and takes an email address.
Nearby applications
Other applications on the Roscommon register close to this address.
About this page: the facts above come from the statutory public planning register kept by Roscommon County Council and are refreshed weekly (last updated 3 Aug 2026). Applicant names and contact details are not shown. Status labels are PlanningLeads' plain-language reading of the register status and the "Use" label is classified by AI from the public description (see how we use AI); neither is legal advice and the council's file is the record. How we handle this data: privacy notice.
Remove my application from this page
If this is your application and you would rather it did not appear here, tell us and we will take the page down. No account, no questions asked. This is your right to object under GDPR Article 21.