Planning application · Offaly County Council

A battery energy storage system facility, comprising battery containers

Townlands of Coolreagh or Cloghanhill Cortullagh or Grove Stonestown and Lumcloon Co. Offaly., Offaly

2660509 · OffalyLodged

23 ha · Lodged

Planning application 2660509 to Offaly County Council: A battery energy storage system facility, comprising battery containers with integrated heating, ventilation, air conditioning units, at Townlands of Coolreagh or Cloghanhill Cortullagh or Grove Stonestown. A council decision is due by 19 November 2026.

Timeline

  1. Application lodged
  2. Council decision due

Key facts

Reference
2660509
Planning authority
Offaly County Council
Received
25 Sept 2026
Decision due
19 Nov 2026
Status
Lodged
Use
Utilities
Site area
23 ha

Proposed development

A battery energy storage system (BESS) facility, comprising battery containers with integrated heating, ventilation, air conditioning (HVAC) units, transformers, inverters, underground cabling, associated control rooms, internal access routes, lighting, CCTV, lightning masts, fencing;• An associated Electrical Compound consisting of: o A low voltage operations compound including one single storey control and operational building, o Electrical plant and equipment, o Cabling, lighting, CCTV, lightning masts; o A backup diesel generator and diesel storage tank; and o Operations and maintenance storage containers. • A high voltage electrical yard comprising outdoor electrical plant and associated infrastructure; • An underground high voltage electrical cable to facilitate a connection to the existing adjacent Stonestown 110kV substation, with an over the fence connection representing the preferred connection strategy; •A peat and spoil area for excavated peat generated during construction of the Proposed Development. Materials stored within the peat and spoil area will be retained within the Proposed Development over its operational lifetime; •Associated landscaping, drainage, and all ancillary works necessary to facilitate the construction, operation and maintenance of the Proposed Development; •Construction of 1 no. Temporary Construction Compound with associated temporary site offices, staff parking area, welfare facilities, and security fencing; •Ancillary forestry felling to facilitate construction and operation of the Proposed Development; •A planning permission duration of 10 years from the date of grant for construction of the Proposed Development; and•An anticipated operational life of 35 years from the date of commissioning of the entire Proposed Development. Certain details of the Proposed Development are unconfirmed in the planning application, and an opinion on unconfirmed details from Offaly County Council pursuant to Section 32H(1) of the Planning and Development Act 2000 (as amended) accompanies this planning application. The details unconfirmed in this application are battery height, length and number of battery containers. The range of parameters under which the battery storage will fall are specified in the design flexibility opinion that accompanies this application. The planning application is also accompanied by a Natura Impact Statement

Planning status

The application has been lodged and validated. The council has eight weeks to decide, unless it asks for further information. The council's decision is due by 19 Nov 2026.

For the applicant

Is this your application?

Say it is yours and you will see which building firms and trades have asked to work on it, with the contact details they chose to leave. It is free and takes an email address. Nothing is shared with anyone unless you choose to contact them.

Sign in to claim itNo cold calls. Nothing is shared unless you choose to.
Free tool · no account needed

Buying or upgrading a home? Get a free solar, SEAI grant and deep-retrofit report.

Enter an address to see its solar potential, the full SEAI grant it qualifies for, and the BER-uplift economics of a deep retrofit - in one report, in minutes.

Nearby applications

Other applications on the Offaly register close to this address.

All Offaly planning applications

Related

About this page: the facts above come from the statutory public planning register kept by Offaly County Council and are refreshed weekly (last updated 12 Oct 2026). Applicant names and contact details are not shown. Status labels are PlanningLeads' plain-language reading of the register status and the "Use" label is classified by AI from the public description (see how we use AI); neither is legal advice and the council's file is the record. How we handle this data: privacy notice.

Remove my application from this page

If this is your application and you would rather it did not appear here, tell us and we will take the page down. No account, no questions asked: we only email you a link to confirm it was you. This is your right to object under GDPR Article 21.