Planning application · Meath County Council

Works to uprate the existing Rinawade – Dunfirth Tee – Kinnegad 110kV overhead line…

Kinnegad - Dunfeirth - Rinawade , Co. Meath

2561103 · MeathGranted
Reference
2561103
Planning authority
Meath County Council
Received
14 Oct 2025
Decided
5 Dec 2025
Status
Granted
Site area
122.2 ha

Proposed development

EirGrid PLC, with the consent and approval of the Electricity Supply Board (ESB), intends to apply for permission for works to uprate the existing Rinawade – Dunfirth Tee – Kinnegad 110kV overhead line (OHL). Within County Meath, the proposed development will take place within the following townlands: JARRETSTOWN, WALTERSTOWN, MOOR OF MEATH, RATHLEEK, GRANGE, BOGGANSTOWN, CAPPAGHCREEN, BROWNSTOWN, SALESTOWN, AFFOLLUS, KILGRAIGUE, HARRISTOWN, PORTERSTOWN, KILCLONE, KIMMINS, BARROCKSTOWN, BALLYMAGILLIN, MULHUSSEY, FERRESTOWN, RODANSTOWN, BATTERSTOWN, DOLANSTOWN, CALGATH, BALFEAGHAN, KILGLIN, FERRANS, CASTLEJORDAN, GORTNAHORNA, KILLASKILLEN, CLONGALL, KNOCKERSALLY OR COLEHILL. The Rinawade - Dunfirth Tee - Kinnegad 110 kV OHL circuit runs through County Meath, County Kildare and County Offaly. It is 54 km in length and travels from Kinnegad 110 kV substation in Killaskillen (County Meath) and traverses southeast where a short loop into Dunfirth 110 kV substation in Dunfirth (County Kildare) exists. The line then continues southeast where it terminates at Rinawade 110kV substation in Rinawade Lower (County Kildare). The OHL has a total of 249no. supporting structures. Within the functional area of Meath County Council, there is 23.16 km of the existing OHL circuit, with 107 no. structures. Within the functional area of Kildare County Council there is 30.66 km, with 140 no. structures, and within the functional area of Offaly County Council there is 0.42 km, with 2 no. structures. Separate planning applications will be lodged with Kildare County Council and Offaly County Council. The proposed development within Co. Meath will comprise: • the replacement (“restringing”) of the existing OHL circuit conductor wires with a new higher capacity conductor between structure numbers 1 - 37, 185 - 214, and 218 - 223; • the replacement of angle mast in-situ at 1no. location, with a new angle mast; • the strengthening of tower foundations at 3no. locations; • the strengthening of towers (i.e., member replacement) at 5no. locations; • the painting of towers at 7no. locations; • shear block remedial works of towers at 1no. locations; • the replacement of polesets at 38no. locations, with similar structures. There will be no change in height at 12no. poleset replacements. There will be height increases between 0.1m and 2.0m at 26no. poleset replacements. • the replumbing of polesets at 11no. locations; • the replacement of insulating and ancillary hardware at

What happens next

Permission was granted on 5 Dec 2025. Third parties may appeal within four weeks; after that the permission is final and works can start once a commencement notice is lodged.

For the applicant

Is this your application?

Sign in to follow it through the Meath planning process, get told when the decision lands, and see which builders and trades are working on similar projects near you. It is free and takes an email address.

Follow this applicationNo cold calls. Nothing is shared unless you choose to.

About this page: the facts above come from the statutory public planning register kept by Meath County Council and are refreshed weekly (last updated 3 Aug 2026). Applicant names and contact details are not shown. Status labels are PlanningLeads' plain-language reading of the register status and the "Use" label is classified by AI from the public description (see how we use AI); neither is legal advice and the council's file is the record. How we handle this data: privacy notice.

Remove my application from this page

If this is your application and you would rather it did not appear here, tell us and we will take the page down. No account, no questions asked. This is your right to object under GDPR Article 21.