Planning application · Meath County Council

the proposed development includes re-instatement and change of use of the derelict…

Bective House & Demesne , Balgill and Bective , Navan

21395 · MeathGranted
Reference
21395
Planning authority
Meath County Council
Received
26 Feb 2021
Decided
9 Sept 2021
Status
Granted
Floor area
12,896 m²
Site area
71.39 ha
Further information requested
21 Apr 2021
Further information received
19 Jul 2021

Proposed development

the proposed development includes re-instatement and change of use of the derelict Bective House (Protected Structure) and ancillary structures, demolition of two extensions to the rear and the addition of new extensions to the rear, to form a hotel with 104 bedrooms. The development also includes reinstatement of the derelict South Lodge gate lodge (part of the Protected Structure) and upgrading of the south access driveway and a road bridge (Protected Structure) over the Clady River. Existing farming and equine industry activities will remain in situ in the overall land holding of 71.39 ha. The development includes: reinstatement and change of use to hotel accommodation of Bective House including ancillary court yard structures (currently in partly ruinous condition) - related alterations to interior, additional access to hotel via courtyard, demolition of two number two storey (total 238.6m2) extensions to rear (two storey flat roof extension within courtyard and two storey early Twentieth Century extension to rear of main block), construct new glazed link block, in lieu of demolished early Twentieth Century extension, connecting to concourse of proposed new three storey hotel buildings to the rear (North East), containing bedrooms, restaurant, kitchen, back of house services, spa, gymnasium and swimming pool over part basement ( 2 number), bedroom block in landscaped inner walled garden, one storey multi-functional centre, with one storey ancillary accommodation containing bedrooms over, in landscaped outer walled garden, replacement single storey, mono-pitched roofed greenhouse in outer walled garden, new single storey orangery/café in inner walled garden, ancillary three storey hotel services block and service yard, with new service road access to rear of proposed hotel complex, electricity switch room and transformer room, standby generator, new foul water pumping station together with a new wastewater treatment system on-site to serve hotel development, discharging via underground rising main to sand polishing filter and percolation area, a bored well (existing), water supply with new water treatment and underground water storage facilities, including for firefighting, re-instatement (including of roof) and change of use of the South Lodge to office/gate lodge, including demolition of ancillary non original additions (6.6m2) and ancillary parking etc. Significant Further information/Revised plans submitted on this application.

What happens next

Permission was granted on 9 Sept 2021. Third parties may appeal within four weeks; after that the permission is final and works can start once a commencement notice is lodged.

For the applicant

Is this your application?

Sign in to follow it through the Meath planning process, get told when the decision lands, and see which builders and trades are working on similar projects near you. It is free and takes an email address.

Follow this applicationNo cold calls. Nothing is shared unless you choose to.

About this page: the facts above come from the statutory public planning register kept by Meath County Council and are refreshed weekly (last updated 6 Jul 2026). Applicant names and contact details are not shown. Status labels are PlanningLeads' plain-language reading of the register status and the "Use" label is classified by AI from the public description (see how we use AI); neither is legal advice and the council's file is the record. How we handle this data: privacy notice.

Remove my application from this page

If this is your application and you would rather it did not appear here, tell us and we will take the page down. No account, no questions asked. This is your right to object under GDPR Article 21.