Planning application · Mayo County Council

Refurbishment and extension of the existing house and outbuildings at Cherry Cottage, Drumminaweelaun

Cherry Cottage, Drumminaweelaun, Westport Co. Mayo

2660558 · MayoGranted

0.616 ha · Granted · permission to Sept 2031 (estimate)

Planning application 2660558 to Mayo County Council: Refurbishment and extension of the existing house and outbuildings, at Cherry Cottage, Drumminaweelaun, Westport. Granted by the council on 3 September 2026. The permission normally runs to September 2031 (an estimate: the grant plus five years).

Timeline

  1. Application lodged
  2. Council granted
  3. Permission normally ends (estimate)

The end date is an estimate: the grant plus five years, the normal life of a permission. An extension or a commencement changes it.

Key facts

Reference
2660558
Planning authority
Mayo County Council
Received
9 Jul 2026
Decided
3 Sept 2026
Status
Granted
Use
Residential
Site area
0.616 ha

Proposed development

The development will consist of the refurbishment and extension of the existing house and outbuildings. In detail: 1.) The demolition of two single-storey wings to the rear of the house and a modern first floor addition. 2.) The refurbishment of the existing house including the replacement of the roof, refurbishment of the timber windows, conservation of the internal woodwork, panelling and historic plasterwork and the installation of new mechanical and electrical services including underfloor heating. 3.) The construction of a new extension to the rear and side, all single storey with a partial basement level. 4.) The change of use of the existing derelict outbuildings to guest accommodation ancillary to the main house and associated works including new natural slate roof, new timber windows, new internal floors and joinery and new mechanical and electrical services. 5.) The construction of a new range of single storey outbuildings to the rear partially buried into the hillside containing an art studio, study and gym with a roof terrace over. 6.) The construction of a single storey covered terrace to the rear. 7.) All associated groundworks, services and landscaping.

Planning status

Permission was granted on 3 Sept 2026. The four-week appeal period has passed with no appeal recorded, so the permission is final. Works can start once a commencement notice is lodged; the permission normally runs to Sept 2031 (estimate).

For the applicant

Is this your application?

Say it is yours and you will see which building firms and trades have asked to work on it, with the contact details they chose to leave. It is free and takes an email address. Nothing is shared with anyone unless you choose to contact them.

Sign in to claim itNo cold calls. Nothing is shared unless you choose to.
Free tool · no account needed

Planning something similar? Check whether you need permission at all.

Since the 2026 regulations many smaller projects are exempt. Answer a few questions about your own job and get the verdict with the regulation it rests on - in about a minute.

Nearby applications

Other applications on the Mayo register close to this address.

All Mayo planning applications

Related

About this page: the facts above come from the statutory public planning register kept by Mayo County Council and are refreshed weekly (last updated 28 Sept 2026). Applicant names and contact details are not shown. Status labels are PlanningLeads' plain-language reading of the register status and the "Use" label is classified by AI from the public description (see how we use AI); neither is legal advice and the council's file is the record. How we handle this data: privacy notice.

Remove my application from this page

If this is your application and you would rather it did not appear here, tell us and we will take the page down. No account, no questions asked: we only email you a link to confirm it was you. This is your right to object under GDPR Article 21.