Planning application · Mayo County Council

The Application will replace the previous consented (but unbuilt) BESS facility granted…

SSE Thermal Tawnaghmore Power Station , Tawnaghmore Upper , Killala Co. Mayo

2660480 · MayoIn Assessment
Reference
2660480
Planning authority
Mayo County Council
Received
19 Jun 2026
Decided
11 Aug 2026
Status
In Assessment
Site area
2.58 ha

Proposed development

The Application will replace the previous consented (but unbuilt) BESS facility granted under planning ref (25/60108). The development will consist of the following elements: • BESS facility including battery containers with integrated HVAC (heating, Ventilation, Air Conditioning) units, transformers, inverters, underground cabling, internal access roads, lighting, CCTV and perimeter fencing; • Associated Electrical Compound consisting of a Low Voltage Operations Independent Power Producer (IPP) Compound including a single storey control and operations building, switchgear room, storage container, car parking, welfare/office facilities; • High voltage electrical yard and Eirgrid 110kV substation building; • 264 meters long 110kV single circuit underground grid connection (UGC) within SSE lands and 119 meters within the existing ESB 110kV Substation lands to facilitate the grid connection to the existing adjacent Tawnaghmore substation; • Proposed internal access tracks to BESS facility, including 4 no. new gate entrances • Reinforced concrete and retaining walls; • A temporary construction compound and associated temporary infrastructure to facilitate the development; • Associated landscaping, drainage, decommissioning of existing septic tank and ancillary works. A 10-year permission is sought in respect of the development. Certain details of the proposed development are unconfirmed in the planning application, and an opinion on unconfirmed details accompanies the application. The Tawnaghmore Power Station has an Environmental Protection Agency (EPA) issued Industrial Emissions (IE) Licence (Reg, No. P0566-02).

What happens next

The council recorded a decision on 11 Aug 2026. The official file has the outcome; a third-party appeal is possible within four weeks of the decision.

For the applicant

Is this your application?

Say it is yours and you will see which building firms and trades have asked to work on it, with the contact details they chose to leave. It is free and takes an email address. Nothing is shared with anyone unless you choose to contact them.

Sign in to claim itNo cold calls. Nothing is shared unless you choose to.

Nearby applications

Other applications on the Mayo register close to this address.

All Mayo planning applications

About this page: the facts above come from the statutory public planning register kept by Mayo County Council and are refreshed weekly (last updated 2 Sept 2026). Applicant names and contact details are not shown. Status labels are PlanningLeads' plain-language reading of the register status and the "Use" label is classified by AI from the public description (see how we use AI); neither is legal advice and the council's file is the record. How we handle this data: privacy notice.

Remove my application from this page

If this is your application and you would rather it did not appear here, tell us and we will take the page down. No account, no questions asked. This is your right to object under GDPR Article 21.