Planning application · Mayo County Council

Works to uprate the existing Castlebar - Dalton 110 kV overhead line

Existing Castlebar - Dalton 110kV overhead power line, See Particulars for multiple townlands, Co Mayo

2560928 · MayoGranted

128.1 ha · Granted · permission to Mar 2031

Planning application 2560928 to Mayo County Council: Works to uprate the existing Castlebar - Dalton 110 kV overhead line, at Existing Castlebar - Dalton 110kV overhead power line, See. Granted by the council on 12 February 2026. The register gives the permission's end as 15 March 2031.

Timeline

  1. Application lodged
  2. Council granted
  3. Permission ends (date on the register)

The end date is the one the council register states. An extension or a commencement changes it.

Key facts

Reference
2560928
Planning authority
Mayo County Council
Received
15 Dec 2025
Decided
12 Feb 2026
Status
Granted
Use
Utilities
Site area
128.1 ha

Proposed development

EirGrid PLC, with the consent and approval of the Electricity Supply Board (ESB), intends to apply for permission for works to uprate the existing Castlebar - Dalton 110 kV overhead line (OHL). The proposed development will take place within the following townlands: Liscromwell Carrowkeel Brees Breandrum or Windsor Prison South Facefield Aghalusky Drumnaslooeen Mossbrook Cloontybaunan Ballinagran Ballynastangford Lower Derrynamraher Rathredmond Birchfield Cappavicar South Dooros Garrywadreen Keelkill Drumadoon Drumneen Ballinvoash Legaun Ballynastangford Upper Gneeve Ballymacloughlin Drumneen (Prendergast) Lisnaran Ballyrourke Ballynew Drumcorrabaun Pollavaddy Eskerlevally Kilmacrade Moat Drumneen South Burris Garhawnagh Castlegar Barrackland Carrowgarve Crantahar Rinnahulty Knocknamoghalaun Drumkeen Carrowmore Rathduff Clare Derreen Heathlawn Kilbeg-Malone Prison North Coolaghbaun The Castlebar - Dalton 110 kV circuit is 27.8 km in length and runs between the existing Castlebar 110 kV substation in the townland of Aghalusky in central County Mayo, to Dalton 110 kV substation located in the townland of Clare, eastern County Mayo. The OHL has a total of 144no. supporting structures. The proposed development will comprise: ? the replacement (“restringing”) of the existing OHL circuit conductor wires with a new higher capacity conductor between Castlebar 110 kV and the Dalton 110 kV substations; ? the replacement of end mast in-situ at 1no. location, with a similar structure; ? the replacement of angle masts in-situ at 6no. locations, with similar structures; ? the strengthening of tower foundations at 4no. locations; ? the strengthening of towers (i.e., member replacement) at 10no. locations; ? the painting of towers at 10no. locations; ? the replacement of tower bolts at 3no. locations; ? the replacement of polesets at 48no. locations, with similar structures. The change in structures will result in standardised heights from 16 m to 24 m along the circuit. The majority of the height increases will be between 0.1 m and 2.0 m; ? the replacement of insulating and ancillary hardware at all structure locations; ? the replacement of earthwire between structure number 132 and structure number 144; ? the replacement of stay wire / anchors and associated fittings at 16no. locations; ? the replacement of crossarms at 58no. locations; ? all associated temporary site development works to gain access to the existing structures inclu

Planning status

Permission was granted on 12 Feb 2026. The four-week appeal period has passed with no appeal recorded, so the permission is final. Works can start once a commencement notice is lodged; the register gives its end as 15 Mar 2031.

For the applicant

Is this your application?

Say it is yours and you will see which building firms and trades have asked to work on it, with the contact details they chose to leave. It is free and takes an email address. Nothing is shared with anyone unless you choose to contact them.

Sign in to claim itNo cold calls. Nothing is shared unless you choose to.
Free tool · no account needed

Buying or upgrading a home? Get a free solar, SEAI grant and deep-retrofit report.

Enter an address to see its solar potential, the full SEAI grant it qualifies for, and the BER-uplift economics of a deep retrofit - in one report, in minutes.

Nearby applications

Other applications on the Mayo register close to this address.

All Mayo planning applications

Related

About this page: the facts above come from the statutory public planning register kept by Mayo County Council and are refreshed weekly (last updated 21 Sept 2026). Applicant names and contact details are not shown. Status labels are PlanningLeads' plain-language reading of the register status and the "Use" label is classified by AI from the public description (see how we use AI); neither is legal advice and the council's file is the record. How we handle this data: privacy notice.

Remove my application from this page

If this is your application and you would rather it did not appear here, tell us and we will take the page down. No account, no questions asked: we only email you a link to confirm it was you. This is your right to object under GDPR Article 21.