Planning application · Mayo County Council

Works to uprate the existing Castlebar - Dalton 110 kV overhead line (OHL). The proposed…

Existing Castlebar - Dalton 110kV overhead power line , See Particulars for multiple townlands , Co Mayo

2560928 · MayoGranted
Reference
2560928
Planning authority
Mayo County Council
Received
15 Dec 2025
Decided
12 Feb 2026
Status
Granted
Use
other
Site area
128.1 ha

Proposed development

EirGrid PLC, with the consent and approval of the Electricity Supply Board (ESB), intends to apply for permission for works to uprate the existing Castlebar - Dalton 110 kV overhead line (OHL). The proposed development will take place within the following townlands: Liscromwell Carrowkeel Brees Breandrum or Windsor Prison South Facefield Aghalusky Drumnaslooeen Mossbrook Cloontybaunan Ballinagran Ballynastangford Lower Derrynamraher Rathredmond Birchfield Cappavicar South Dooros Garrywadreen Keelkill Drumadoon Drumneen Ballinvoash Legaun Ballynastangford Upper Gneeve Ballymacloughlin Drumneen (Prendergast) Lisnaran Ballyrourke Ballynew Drumcorrabaun Pollavaddy Eskerlevally Kilmacrade Moat Drumneen South Burris Garhawnagh Castlegar Barrackland Carrowgarve Crantahar Rinnahulty Knocknamoghalaun Drumkeen Carrowmore Rathduff Clare Derreen Heathlawn Kilbeg-Malone Prison North Coolaghbaun The Castlebar - Dalton 110 kV circuit is 27.8 km in length and runs between the existing Castlebar 110 kV substation in the townland of Aghalusky in central County Mayo, to Dalton 110 kV substation located in the townland of Clare, eastern County Mayo. The OHL has a total of 144no. supporting structures. The proposed development will comprise: ? the replacement (“restringing”) of the existing OHL circuit conductor wires with a new higher capacity conductor between Castlebar 110 kV and the Dalton 110 kV substations; ? the replacement of end mast in-situ at 1no. location, with a similar structure; ? the replacement of angle masts in-situ at 6no. locations, with similar structures; ? the strengthening of tower foundations at 4no. locations; ? the strengthening of towers (i.e., member replacement) at 10no. locations; ? the painting of towers at 10no. locations; ? the replacement of tower bolts at 3no. locations; ? the replacement of polesets at 48no. locations, with similar structures. The change in structures will result in standardised heights from 16 m to 24 m along the circuit. The majority of the height increases will be between 0.1 m and 2.0 m; ? the replacement of insulating and ancillary hardware at all structure locations; ? the replacement of earthwire between structure number 132 and structure number 144; ? the replacement of stay wire / anchors and associated fittings at 16no. locations; ? the replacement of crossarms at 58no. locations; ? all associated temporary site development works to gain access to the existing structures inclu

What happens next

Permission was granted on 12 Feb 2026. Third parties may appeal within four weeks; after that the permission is final and works can start once a commencement notice is lodged.

For the applicant

Is this your application?

Sign in to follow it through the Mayo planning process, get told when the decision lands, and see which builders and trades are working on similar projects near you. It is free and takes an email address.

Follow this applicationNo cold calls. Nothing is shared unless you choose to.

About this page: the facts above come from the statutory public planning register kept by Mayo County Council and are refreshed weekly (last updated 7 Jul 2026). Applicant names and contact details are not shown. Status labels are PlanningLeads' plain-language reading of the register status and the "Use" label is classified by AI from the public description (see how we use AI); neither is legal advice and the council's file is the record. How we handle this data: privacy notice.

Remove my application from this page

If this is your application and you would rather it did not appear here, tell us and we will take the page down. No account, no questions asked. This is your right to object under GDPR Article 21.