A renewable energy development as defined by The European Union Regulations 2025 at Ballygoghlan, Glin
Ballygoghlan, Glin, Co. Limerick
70.01 ha · Lodged
Planning application 2660943 to Limerick City and County Council: A renewable energy development as defined by The European Union Regulations 2025, at Ballygoghlan, Glin. A council decision is due by 27 September 2026.
Timeline
- Application lodged
- Council decision due
Key facts
Proposed development
a renewable energy development as defined by The European Union (Planning and Development) (Renewable Energy) Regulations 2025. The Proposed Development, subject of this application, will consist of: The development and operation of a solar photovoltaic (PV) farm with a total area of 245.33 ha, 70.01 ha of which lies within Co. Limerick. The application seeks a 10-year permission with an operational lifetime of 40 years and comprises the following – i. Construction and operation of up to 219,706.1sqm of solar PV arrays on ground-mounted metal frames, with a maximum overall height of up to 2.79 metres. ii. Internal underground trenching, electrical cabling and ducting between the solar PV arrays and electrical invertor / transformer skid units. iii. Up to 8 no. electrical inverter / transformer skid units. iv. Construction and operational access to the site by 3 no. site entrances using existing field access points. v. 2 no. temporary construction compounds and ancillary facilities for the duration of the construction phase of the project. vi. Customer substation compound consisting of a single storey substation customer building with welfare facilities (217 sqm), all associated electrical plant and apparatus, underground cabling, lighting columns, parking, storage, fencing, wastewater holding tank and rainwater harvesting tank. vii. 33kV collector cable network, joint bays and associated works. viii. Internal access tracks, site landscaping and drainage works, security fencing, CCTV and all associated ancillary site development works. ix. The decommissioning and reinstatement of the solar farm at the end of its operational life. The elements of the Proposed Project located in Co. Limerick, as described above in i – ix, are the subject of this planning application. The remaining elements, including the construction of up to 541,306.68 sqm of solar PV arrays on ground-mounted metal frames, with a maximum overall height of up to 2.79 metres, internal underground trenching, electrical cabling and ducting between the solar PV arrays and electrical invertor / transformer skid units, up to 19 no. electrical / inverter transformer skid units, construction and operational access to the site by 6 no. site entrances, using 4 no. existing field access points and 2 no. new access points, 3 no. temporary construction compounds and ancillary facilities for the duration of the construction phase of the project, 33kV collector cable network, joint ba
Planning status
The application has been lodged and validated. The council has eight weeks to decide, unless it asks for further information. The council's decision is due by 27 Sept 2026.
Is this your application?
Say it is yours and you will see which building firms and trades have asked to work on it, with the contact details they chose to leave. It is free and takes an email address. Nothing is shared with anyone unless you choose to contact them.
Nearby applications
Other applications on the Limerick register close to this address.
Related
About this page: the facts above come from the statutory public planning register kept by Limerick City and County Council and are refreshed weekly (last updated 5 Oct 2026). Applicant names and contact details are not shown. Status labels are PlanningLeads' plain-language reading of the register status and the "Use" label is classified by AI from the public description (see how we use AI); neither is legal advice and the council's file is the record. How we handle this data: privacy notice.
Remove my application from this page
If this is your application and you would rather it did not appear here, tell us and we will take the page down. No account, no questions asked: we only email you a link to confirm it was you. This is your right to object under GDPR Article 21.